| 2026 | Construction Start | China | Xuwei-1HPR1000 (Hualong One)729 MW · 16 January 2026 |
| Jinqimen-2HPR1000 (Hualong One)1233 MW · 4 April 2026 |
| Hungary | Paks-5VVER-1200/V-5271185 MW · 5 February 2026 |
| India | Kaiga-5Horizontal Pressure Tube Type630 MW · 1 March 2026 |
| Grid Connection | China | Taipingling-1HPR1000 (Hualong One)1116 MW · 13 February 2026 |
| Sanao-1HPR1000 (Hualong One)1117 MW · 12 March 2026 |
| Grid Reconnection (after LTO) | Canada | Darlington-4CANDU 850878 MW · 13 March 2026 |
| India | Tarapur-1BWR-1 (Mark 2)210 MW · 16 February 2026 |
| Japan | Kashiwazaki Kariwa-6ABWR1315 MW · 16 February 2026 |
| South Korea | Kori-2WH F605 MW · 4 April 2026 |
| 2025 | Construction Start | China | Lufeng-1CAP10001250 MW · 24 February 2025 |
| Shidaowan-2HPR1000 (Hualong One)1134 MW · 8 May 2025 |
| Taipingling-3HPR1000 (Hualong One)1209 MW · 10 June 2025 |
| Jinqimen-1HPR1000 (Hualong One)1233 MW · 10 August 2025 |
| Sanao-3HPR1000 (Hualong One)1208 MW · 18 November 2025 |
| Zhaoyuan-1HPR1000 (Hualong One)1116 MW · 18 November 2025 |
| Ningde-6HPR1000 (Hualong One)1200 MW · 16 December 2025 |
| Bailong-1CAP10001160 MW · 22 December 2025 |
| Lufeng-2CAP10001250 MW · 22 December 2025 |
| Russia | Leningrad 2-4VVER-1200/V-4911150 MW · 20 March 2025 |
| South Korea | Shin-Hanul-3APR-14001340 MW · 20 May 2025 |
| Grid Connection | China | Shidaowan Guohe One-2CAP14001400 MW · 2025 |
| Zhangzhou-2HPR1000 (Hualong One)1126 MW · 22 November 2025 |
| India | Rajasthan-7Horizontal Pressure Tube Type630 MW · 17 March 2025 |
| Russia | Kursk 2-1VVER-TOI/V-5101200 MW · 31 December 2025 |
| Entering Long-Term Outage (LTO) | South Korea | Kori-4WH F1001 MW · 6 August 2025 |
| Hanbit-1WH F965 MW · 9 December 2025 |
| Closure | Belgium | Doel-1WH 2LP445 MW · 15 February 2025 |
| Tihange-1Framatome 3 Loops962 MW · 30 September 2025 |
| Doel-2WH 2LP445 MW · 30 November 2025 |
| Russia | Bilibino-2EGP-611 MW · 3 December 2025 |
| Bilibino-3EGP-611 MW · 2025 |
| Bilibino-4EGP-611 MW · 30 December 2025 |
| Taiwan | Maanshan-2WH 3LP (WE 312)938 MW · 17 May 2025 |
| 2024 | Construction Start | China | Zhangzhou-3HPR1000 (Hualong One)1129 MW · 22 February 2024 |
| Lianjiang-2CAP10001224 MW · 26 April 2024 |
| Xudapu-2CAP10001000 MW · 17 July 2024 |
| Ningde-5HPR1000 (Hualong One)1200 MW · 28 July 2024 |
| Shidaowan-1HPR1000 (Hualong One)1134 MW · 28 July 2024 |
| Zhangzhou-4HPR1000 (Hualong One)1129 MW · 27 September 2024 |
| Egypt | El Dabaa-4VVER-1200/V-5291100 MW · 23 January 2024 |
| Pakistan | Chasnupp-5HPR1000 (Hualong One)1100 MW · 30 December 2024 |
| Russia | Leningrad 2-3VVER-1200/V-4911150 MW · 15 March 2024 |
| Construction Suspension or Cancellation | Argentina | Carem25CAREM Prototype25 MW · 2024 |
| Grid Connection | China | Fangchenggang-4HPR1000 (Hualong One)1000 MW · 9 April 2024 |
| Shidaowan Guohe One-1CAP14001400 MW · 31 October 2024 |
| Zhangzhou-1HPR1000 (Hualong One)1126 MW · 28 November 2024 |
| France | Flamanville-3EPR1630 MW · 21 December 2024 |
| India | Kakrapar-4PHWR-700630 MW · 20 February 2024 |
| United Arab Emirates | Barakah-4APR-14001310 MW · 23 March 2024 |
| United States | Vogtle-4AP-10001117 MW · 6 March 2024 |
| Entering Long-Term Outage (LTO) | South Korea | Kori-3WH F895 MW · 28 September 2024 |
| Grid Reconnection (after LTO) | Canada | Darlington-1CANDU 850881 MW · 30 November 2024 |
| India | Rajasthan-3Horizontal Pressure Tube Type200 MW · 29 July 2024 |
| Japan | Onagawa-2BWR-5796 MW · 15 November 2024 |
| Shimane-2BWR-5791 MW · 23 December 2024 |
| Closure | Canada | Pickering-1CANDU 500A514 MW · 1 October 2024 |
| Pickering-4CANDU 500A514 MW · 31 December 2024 |
| Russia | Kursk-2RBMK-1000925 MW · 31 January 2024 |
| Taiwan | Maanshan-1WH 3LP (WE 312)890 MW · 28 July 2024 |
| 2023 | Construction Start | China | Sanmen-4CAP10001163 MW · 22 March 2023 |
| Haiyang-4CAP10001161 MW · 22 April 2023 |
| Lufeng-6HPR1000 (Hualong One)1116 MW · 26 August 2023 |
| Lianjiang-1CAP10001224 MW · 29 September 2023 |
| Xudapu-1CAP10001000 MW · 15 November 2023 |
| Egypt | El Dabaa-3VVER-1200/V-5291100 MW · 3 May 2023 |
| Construction Suspension or Cancellation | Brazil | Angra-3Pre-Konvoi1340 MW · 2023 |
| Grid Connection | Belarus | Belarusian-2VVER-1200/V-4911110 MW · 13 May 2023 |
| China | Fangchenggang-3HPR1000 (Hualong One)1000 MW · 10 January 2023 |
| Slovakia | Mochovce-3VVER-440/V-213440 MW · 31 January 2023 |
| South Korea | Shin-Hanul-2APR-14001340 MW · 21 December 2023 |
| United States | Vogtle-3AP-10001117 MW · 31 March 2023 |
| Entering Long-Term Outage (LTO) | Canada | Bruce-3CANDU 750A770 MW · 1 March 2023 |
| Darlington-4CANDU 850878 MW · 19 July 2023 |
| China | CEFRBN-2020 MW · 2023 |
| South Korea | Kori-2WH F605 MW · 8 April 2023 |
| Grid Reconnection (after LTO) | Canada | Darlington-3CANDU 850881 MW · 17 July 2023 |
| Bruce-6CANDU 750B795 MW · 8 September 2023 |
| France | Penly-1P4 REP 13001330 MW · 13 July 2023 |
| Japan | Takahama-1M (3-Loop)780 MW · 2 August 2023 |
| Takahama-2M (3-Loop)780 MW · 15 September 2023 |
| Closure | Belgium | Tihange-2WH 3LP900 MW · 31 January 2023 |
| Germany | Emsland (KKE)Konvoi1242 MW · 15 April 2023 |
| Isar-2 (KKI-2)Konvoi1310 MW · 15 April 2023 |
| Neckarwestheim-2 (GKN-2)Konvoi1225 MW · 15 April 2023 |
| Taiwan | Kuosheng-2BWR-6951 MW · 14 March 2023 |
| 2022 | Construction Start | China | Tianwan-8VVER-1200/V-4911171 MW · 25 February 2022 |
| Xudapu-4VVER-1200/V-4911200 MW · 19 May 2022 |
| Sanmen-3CAP10001163 MW · 28 June 2022 |
| Haiyang-3CAP10001161 MW · 7 July 2022 |
| Lufeng-5HPR1000 (Hualong One)1116 MW · 8 September 2022 |
| Egypt | El Dabaa-1VVER-1200/V-5291100 MW · 20 July 2022 |
| El Dabaa-2VVER-1200/V-5291100 MW · 19 November 2022 |
| Russia | Cape Nagloynyn 1-1RITM-200S55 MW · 30 August 2022 |
| Cape Nagloynyn 1-2RITM-200S55 MW · 30 August 2022 |
| Türkiye | Akkuyu-4VVER-1200/V-5091114 MW · 21 July 2022 |
| Construction Restart | Brazil | Angra-3Pre-Konvoi1340 MW · 2022 |
| Grid Connection | China | Fuqing-6HPR1000 (Hualong One)1075 MW · 1 January 2022 |
| Hongyanhe-6ACPR-10001061 MW · 2 May 2022 |
| Shidao Bay 1-2HTR-PM100 MW · 9 December 2022 |
| Finland | Olkiluoto-3EPR1600 MW · 12 March 2022 |
| Pakistan | Kanupp-3HPR1000 (Hualong One)1014 MW · 4 March 2022 |
| South Korea | Shin-Hanul-1APR-14001340 MW · 9 June 2022 |
| United Arab Emirates | Barakah-3APR-14001310 MW · 8 October 2022 |
| Entering Long-Term Outage (LTO) | Canada | Darlington-1CANDU 850881 MW · 15 February 2022 |
| India | Rajasthan-3Horizontal Pressure Tube Type200 MW · 28 October 2022 |
| Ukraine | Zaporizhzhya-1VVER-1000/V-320950 MW · 2022 |
| Zaporizhzhya-2VVER-1000/V-320950 MW · 2022 |
| Zaporizhzhya-3VVER-1000/V-320950 MW · 2022 |
| Zaporizhzhya-4VVER-1000/V-3201000 MW · 2022 |
| Zaporizhzhya-5VVER-1000/V-320950 MW · 2022 |
| Zaporizhzhya-6VVER-1000/V-320950 MW · 2022 |
| Grid Reconnection (after LTO) | South Korea | Hanbit-4OPR-1000950 MW · 11 December 2022 |
| Closure | Belgium | Doel-3WH 3LP900 MW · 23 September 2022 |
| United Kingdom | Hunterston B-2AGR500 MW · 7 January 2022 |
| Hinkley Point B-2AGR400 MW · 6 July 2022 |
| Hinkley Point B-1AGR400 MW · 1 August 2022 |
| United States | PalisadesCE 2LP (DRYAMB)400 MW · 20 May 2022 |
| 2021 | Construction Start | China | Changjiang-3HPR1000 (Hualong One)1000 MW · 31 March 2021 |
| Tianwan-7VVER-1200/V-4911171 MW · 19 May 2021 |
| Xudapu-3VVER-1200/V-4911200 MW · 19 May 2021 |
| Changjiang SMR-1ACP100 (Linglong One)100 MW · 13 July 2021 |
| Changjiang-4HPR1000 (Hualong One)1000 MW · 28 December 2021 |
| Sanao-2HPR1000 (Hualong One)1117 MW · 30 December 2021 |
| India | Kudankulam-5VVER-1000/V-412917 MW · 29 June 2021 |
| Kudankulam-6VVER-1000/V-412917 MW · 20 December 2021 |
| Russia | Brest-OD-300Brest-OD-300300 MW · 8 June 2021 |
| Türkiye | Akkuyu-3VVER-1200/V-5091114 MW · 10 March 2021 |
| Grid Connection | China | Tianwan-6ACPR-10001000 MW · 11 May 2021 |
| Hongyanhe-5ACPR-10001061 MW · 25 June 2021 |
| Shidao Bay 1-1HTR-PM100 MW · 20 December 2021 |
| India | Kakrapar-3PHWR-700630 MW · 10 January 2021 |
| Pakistan | Kanupp-2HPR1000 (Hualong One)1017 MW · 18 March 2021 |
| United Arab Emirates | Barakah-2APR-14001310 MW · 14 September 2021 |
| Entering Long-Term Outage (LTO) | France | Penly-1P4 REP 13001330 MW · 2 October 2021 |
| Grid Reconnection (after LTO) | China | CEFRBN-2020 MW · 15 February 2021 |
| Japan | Mihama-3M (3-Loop)780 MW · 29 June 2021 |
| Ikata-3M (3-Loop)846 MW · 6 December 2021 |
| Closure | Germany | Brokdorf (KBR)Pre-Konvoi1307 MW · 31 December 2021 |
| Grohnde (KWG)Pre-Konvoi1290 MW · 31 December 2021 |
| Gundremmingen-C (GUN-C)BWR-721244 MW · 31 December 2021 |
| Pakistan | Kanupp-1CANDU-137 MW137 MW · 1 August 2021 |
| Russia | Kursk-1RBMK-1000925 MW · 19 December 2021 |
| Taiwan | Kuosheng-1BWR-6951 MW · 1 July 2021 |
| United Kingdom | Hunterston B-1AGR459 MW · 26 November 2021 |
| United States | Indian Point-3WH 4LP (DRYAMB)873 MW · 30 April 2021 |
| 2020 | Construction Start | China | Zhangzhou-2HPR1000 (Hualong One)1126 MW · 4 September 2020 |
| Taipingling-2HPR1000 (Hualong One)1116 MW · 15 October 2020 |
| Xiapu-2CFR-600642 MW · 29 December 2020 |
| Sanao-1HPR1000 (Hualong One)1117 MW · 31 December 2020 |
| Türkiye | Akkuyu-2VVER-1200/V-5091114 MW · 26 June 2020 |
| Grid Connection | Belarus | Belarusian-1VVER-1200/V-4911110 MW · 3 November 2020 |
| China | Tianwan-5ACPR-10001000 MW · 8 August 2020 |
| Fuqing-5HPR1000 (Hualong One)1075 MW · 27 November 2020 |
| Russia | Leningrad 2-2VVER-1200/V-4911066 MW · 23 October 2020 |
| United Arab Emirates | Barakah-1APR-14001310 MW · 19 August 2020 |
| Entering Long-Term Outage (LTO) | Canada | Bruce-6CANDU 750B795 MW · 17 January 2020 |
| Darlington-3CANDU 850881 MW · 30 July 2020 |
| India | Tarapur-1BWR-1 (Mark 2)210 MW · 1 April 2020 |
| Tarapur-2BWR-1 (Mark 2)210 MW · 1 August 2020 |
| Grid Reconnection (after LTO) | Canada | Darlington-2CANDU 850881 MW · 4 June 2020 |
| South Korea | Hanbit-3OPR-1000950 MW · 14 November 2020 |
| United Kingdom | Hunterston B-1AGR459 MW · 31 August 2020 |
| Closure | France | Fessenheim-1CP0890 MW · 22 February 2020 |
| Fessenheim-2CP0890 MW · 29 June 2020 |
| Russia | Leningrad-2RBMK-1000925 MW · 22 November 2020 |
| Sweden | Ringhals-1AA-I762 MW · 31 December 2020 |
| United States | Indian Point-2WH 4LP (DRYAMB)873 MW · 30 April 2020 |
| Duane Arnold-1BWR-4 (Mark 1)515 MW · 10 August 2020 |
| 2019 | Construction Start | China | Shidaowan Guohe One-1CAP14001400 MW · 6 April 2019 |
| Zhangzhou-1HPR1000 (Hualong One)1126 MW · 16 October 2019 |
| Shidaowan Guohe One-2CAP14001400 MW · 2 November 2019 |
| Taipingling-1HPR1000 (Hualong One)1116 MW · 26 December 2019 |
| Russia | Kursk 2-2VVER-TOI/V-5101200 MW · 15 April 2019 |
| United Kingdom | Hinkley Point C-2EPR-17501630 MW · 12 December 2019 |
| Construction Restart | Iran | Bushehr-2VVER-1000/V-528 AES-92 GIII+974 MW · 2019 |
| Grid Connection | China | Taishan-2EPR-17501660 MW · 23 June 2019 |
| Yangjiang-6ACPR-10001000 MW · 29 June 2019 |
| Russia | Novovoronezh 2-2VVER-1200/V-392M1114 MW · 1 May 2019 |
| Akademik Lomonosov-1KLT-40S 'Floating'32 MW · 19 December 2019 |
| Akademik Lomonosov-2KLT-40S 'Floating'32 MW · 19 December 2019 |
| South Korea | Saeul-2APR-14001340 MW · 22 April 2019 |
| Entering Long-Term Outage (LTO) | Japan | Ikata-3M (3-Loop)846 MW · 29 December 2019 |
| Grid Reconnection (after LTO) | Argentina | EmbalseCANDU 6600 MW · 31 January 2019 |
| India | Kakrapar-1Horizontal Pressure Tube Type194 MW · 24 May 2019 |
| Closure | Germany | Philippsburg-2 (KKP-2)PWR1268 MW · 31 December 2019 |
| Sweden | Ringhals-2WH 3LP822 MW · 30 December 2019 |
| Switzerland | MuehlebergBWR-4323 MW · 20 December 2019 |
| United States | Pilgrim-1BWR-3 (Mark 1)687 MW · 31 May 2019 |
| Three Mile Island-1B&W LLP (DRYAMB)792 MW · 20 September 2019 |
| 2018 | Construction Start | Bangladesh | Rooppur-2VVER-1200/V-5231080 MW · 14 July 2018 |
| Russia | Kursk 2-1VVER-TOI/V-5101200 MW · 29 April 2018 |
| South Korea | Saeul-4APR-14001340 MW · 19 September 2018 |
| Türkiye | Akkuyu-1VVER-1200/V-5091114 MW · 3 April 2018 |
| United Kingdom | Hinkley Point C-1EPR-17501630 MW · 11 December 2018 |
| Grid Connection | China | Yangjiang-5ACPR-10001021 MW · 23 May 2018 |
| Taishan-1EPR-17501660 MW · 29 June 2018 |
| Sanmen-1AP-10001157 MW · 30 June 2018 |
| Haiyang-1AP-10001126 MW · 17 August 2018 |
| Sanmen-2AP-10001157 MW · 24 August 2018 |
| Haiyang-2AP-10001126 MW · 13 October 2018 |
| Tianwan-4VVER-1000/V-428M1060 MW · 27 October 2018 |
| Russia | Rostov-4VVER-1000/V-320950 MW · 2 February 2018 |
| Leningrad 2-1VVER-1200/V-4911066 MW · 9 March 2018 |
| Entering Long-Term Outage (LTO) | India | Madras-1 (Kalpakam-1)Horizontal Pressure Tube Type210 MW · 30 January 2018 |
| South Korea | Hanbit-3OPR-1000950 MW · 11 May 2018 |
| United Kingdom | Hunterston B-1AGR459 MW · 9 March 2018 |
| Dungeness B-2AGR450 MW · 27 August 2018 |
| Dungeness B-1AGR600 MW · 23 September 2018 |
| Grid Reconnection (after LTO) | France | Paluel-2P4 REP 13001290 MW · 23 July 2018 |
| India | Kakrapar-2Horizontal Pressure Tube Type195 MW · 22 September 2018 |
| Japan | Ohi-3M (4-Loop)1127 MW · 14 March 2018 |
| Genkai-3M (4-Loop)1127 MW · 23 March 2018 |
| Ohi-4M (4-Loop)1127 MW · 9 May 2018 |
| Genkai-4M (4-Loop)1127 MW · 20 June 2018 |
| Switzerland | Beznau-1WH 2LP364 MW · 20 March 2018 |
| Closure | Russia | Bilibino-1EGP-610 MW · 31 March 2018 |
| Leningrad-1RBMK-1000925 MW · 22 December 2018 |
| United Kingdom | Dungeness B-2AGR450 MW · 27 August 2018 |
| Dungeness B-1AGR600 MW · 23 September 2018 |
| United States | Oyster CreekBWR-2 (Mark 1)540 MW · 17 September 2018 |
| 2017 | Construction Start | Bangladesh | Rooppur-1VVER-1200/V-5231080 MW · 30 November 2017 |
| China | Xiapu-1CFR-600642 MW · 29 December 2017 |
| India | Kudankulam-3VVER-1000/V-412917 MW · 29 June 2017 |
| Kudankulam-4VVER-1000/V-412917 MW · 23 October 2017 |
| South Korea | Saeul-3APR-14001340 MW · 3 April 2017 |
| Construction Suspension or Cancellation | United States | Summer-2AP-10001117 MW · 2017 |
| Summer-3AP-10001117 MW · 2017 |
| Grid Connection | China | Yangjiang-4CPR-10001000 MW · 8 January 2017 |
| Fuqing-4CPR-10001000 MW · 29 July 2017 |
| Tianwan-3VVER-1000/V-428M1060 MW · 30 December 2017 |
| Pakistan | Chasnupp-4CNP-300315 MW · 29 June 2017 |
| Entering Long-Term Outage (LTO) | China | CEFRBN-2020 MW · 2017 |
| South Korea | Hanbit-4OPR-1000950 MW · 31 May 2017 |
| Grid Reconnection (after LTO) | France | Bugey-5CP0900 MW · 23 July 2017 |
| Japan | Takahama-4M (3-Loop)830 MW · 22 May 2017 |
| Closure | Germany | Gundremmingen-B (GUN-B)BWR-721244 MW · 31 December 2017 |
| South Korea | Wolsong-1CANDU 6628 MW · 28 May 2017 |
| Kori-1WH 60555 MW · 18 June 2017 |
| Sweden | Oskarshamn-1AA-I440 MW · 17 June 2017 |
| Taiwan | Chinshan-2BWR-4604 MW · 1 June 2017 |
| 2016 | Construction Start | China | Tianwan-6ACPR-10001000 MW · 7 September 2016 |
| Fangchenggang-4HPR1000 (Hualong One)1000 MW · 23 December 2016 |
| Pakistan | Kanupp-3HPR1000 (Hualong One)1014 MW · 31 May 2016 |
| Grid Connection | China | Ningde-4CPR-10001018 MW · 29 March 2016 |
| Hongyanhe-4CPR-10001061 MW · 1 April 2016 |
| Changjiang-2CNP-600601 MW · 20 June 2016 |
| Fangchenggang-2CPR-10001000 MW · 15 July 2016 |
| Fuqing-3CPR-10001000 MW · 7 September 2016 |
| India | Kudankulam-2VVER-1000/V-412917 MW · 29 August 2016 |
| Pakistan | Chasnupp-3CNP-300315 MW · 15 October 2016 |
| Russia | Novovoronezh 2-1VVER-1200/V-392M1114 MW · 5 August 2016 |
| South Korea | Saeul-1APR-14001400 MW · 15 January 2016 |
| United States | Watts Bar-2WH 4LP (ICECND)1165 MW · 3 June 2016 |
| Entering Long-Term Outage (LTO) | Canada | Darlington-2CANDU 850881 MW · 1 October 2016 |
| India | Kakrapar-1Horizontal Pressure Tube Type194 MW · 11 March 2016 |
| Grid Reconnection (after LTO) | Japan | Takahama-3M (3-Loop)830 MW · 29 January 2016 |
| Ikata-3M (3-Loop)846 MW · 15 August 2016 |
| Sweden | Ringhals-2WH 3LP822 MW · 26 November 2016 |
| Closure | Russia | Novovoronezh-3VVER-440/V-179385 MW · 24 December 2016 |
| United States | Fort Calhoun-1CE 2LP457 MW · 24 October 2016 |
| 2015 | Construction Start | China | Hongyanhe-5ACPR-10001061 MW · 29 March 2015 |
| Fuqing-5HPR1000 (Hualong One)1075 MW · 7 May 2015 |
| Hongyanhe-6ACPR-10001061 MW · 24 July 2015 |
| Fuqing-6HPR1000 (Hualong One)1075 MW · 22 December 2015 |
| Fangchenggang-3HPR1000 (Hualong One)1000 MW · 24 December 2015 |
| Tianwan-5ACPR-10001000 MW · 27 December 2015 |
| Pakistan | Kanupp-2HPR1000 (Hualong One)1017 MW · 20 August 2015 |
| United Arab Emirates | Barakah-4APR-14001310 MW · 30 July 2015 |
| Construction Suspension or Cancellation | Brazil | Angra-3Pre-Konvoi1340 MW · 2015 |
| Grid Connection | China | Fangjiashan-2CPR-10001000 MW · 12 January 2015 |
| Yangjiang-2CPR-10001000 MW · 10 March 2015 |
| Ningde-3CPR-10001018 MW · 21 March 2015 |
| Hongyanhe-3CPR-10001000 MW · 23 March 2015 |
| Fuqing-2CPR-10001000 MW · 6 August 2015 |
| Yangjiang-3CPR-10001000 MW · 18 October 2015 |
| Fangchenggang-1CPR-10001000 MW · 25 October 2015 |
| Changjiang-1CNP-600601 MW · 7 November 2015 |
| Russia | Beloyarsk-4 (BN-800)BN-800789 MW · 10 December 2015 |
| South Korea | Shin-Wolsong-2OPR-1000950 MW · 26 February 2015 |
| Entering Long-Term Outage (LTO) | Argentina | EmbalseCANDU 6600 MW · 31 December 2015 |
| France | Paluel-2P4 REP 13001290 MW · 16 May 2015 |
| Bugey-5CP0900 MW · 27 August 2015 |
| India | Kakrapar-2Horizontal Pressure Tube Type195 MW · 1 July 2015 |
| Switzerland | Beznau-1WH 2LP364 MW · 1 July 2015 |
| Grid Reconnection (after LTO) | Japan | Sendai-1M (3-Loop)846 MW · 14 August 2015 |
| Sendai-2M (3-Loop)846 MW · 15 October 2015 |
| South Korea | Wolsong-1CANDU 6628 MW · 23 June 2015 |
| Closure | Germany | Grafenrheinfeld (KKG)Pre-Konvoi1229 MW · 30 June 2015 |
| United Kingdom | Wylfa-1MAGNOX495 MW · 30 December 2015 |
| 2014 | Construction Start | Argentina | Carem25CAREM Prototype25 MW · 8 February 2014 |
| Belarus | Belarusian-2VVER-1200/V-4911110 MW · 3 June 2014 |
| United Arab Emirates | Barakah-3APR-14001310 MW · 24 September 2014 |
| Construction Suspension or Cancellation | Japan | OhmaABWR1325 MW · 2014 |
| Taiwan | Lungmen-1ABWR1300 MW · 2014 |
| Lungmen-2ABWR1300 MW · 2014 |
| Grid Connection | Argentina | Atucha-2PHWR KWU692 MW · 27 June 2014 |
| China | Ningde-2CPR-10001018 MW · 4 January 2014 |
| Fuqing-1CPR-10001000 MW · 20 August 2014 |
| Fangjiashan-1CPR-10001000 MW · 4 November 2014 |
| Russia | Rostov-3VVER-1000/V-320950 MW · 27 December 2014 |
| Entering Long-Term Outage (LTO) | Sweden | Ringhals-2WH 3LP822 MW · 15 August 2014 |
| Taiwan | Chinshan-1BWR-4604 MW · 31 December 2014 |
| Closure | Taiwan | Chinshan-1BWR-4604 MW · 31 December 2014 |
| United States | Vermont YankeeBWR-4 (Mark 1)514 MW · 29 December 2014 |
| 2013 | Construction Start | Belarus | Belarusian-1VVER-1200/V-4911110 MW · 6 November 2013 |
| China | Yangjiang-5ACPR-10001021 MW · 18 September 2013 |
| Tianwan-4VVER-1000/V-428M1060 MW · 27 September 2013 |
| Yangjiang-6ACPR-10001000 MW · 23 December 2013 |
| South Korea | Shin-Hanul-2APR-14001340 MW · 19 June 2013 |
| United Arab Emirates | Barakah-2APR-14001310 MW · 30 May 2013 |
| United States | Summer-2AP-10001117 MW · 9 March 2013 |
| Vogtle-3AP-10001117 MW · 12 March 2013 |
| Summer-3AP-10001117 MW · 2 November 2013 |
| Vogtle-4AP-10001117 MW · 19 November 2013 |
| Construction Suspension or Cancellation | Russia | Baltic-1VVER-1200/V-4911109 MW · 2013 |
| Grid Connection | China | Hongyanhe-1CPR-10001061 MW · 17 February 2013 |
| Hongyanhe-2CPR-10001061 MW · 23 November 2013 |
| Yangjiang-1CPR-10001021 MW · 31 December 2013 |
| India | Kudankulam-1VVER-1000/V-412932 MW · 22 October 2013 |
| Entering Long-Term Outage (LTO) | Japan | Ohi-3M (4-Loop)1127 MW · 2 September 2013 |
| Ohi-4M (4-Loop)1127 MW · 15 September 2013 |
| Closure | Sweden | Oskarshamn-2AA-I565 MW · 31 May 2013 |
| United States | KewauneeWH 4LP (DRYAMB)535 MW · 7 May 2013 |
| 2012 | Construction Start | China | Fuqing-4CPR-10001000 MW · 17 November 2012 |
| Yangjiang-4CPR-10001000 MW · 17 November 2012 |
| Shidao Bay 1-1HTR-PM100 MW · 9 December 2012 |
| Shidao Bay 1-2HTR-PM100 MW · 9 December 2012 |
| Tianwan-3VVER-1000/V-428M1060 MW · 27 December 2012 |
| Russia | Baltic-1VVER-1200/V-4911109 MW · 22 February 2012 |
| South Korea | Shin-Hanul-1APR-14001340 MW · 10 July 2012 |
| United Arab Emirates | Barakah-1APR-14001310 MW · 19 July 2012 |
| Construction Suspension or Cancellation | Bulgaria | Belene-1VVER-1000/V-466953 MW · 2012 |
| Belene-2VVER-1000/V-466953 MW · 2012 |
| Russia | Kursk-5RBMK-1000925 MW · 2012 |
| Construction Restart | Japan | OhmaABWR1325 MW · 2012 |
| Grid Connection | China | Ningde-1CPR-10001018 MW · 28 December 2012 |
| South Korea | Shin-Wolsong-1OPR-1000950 MW · 27 January 2012 |
| Shin-Kori-2OPR-1000995 MW · 28 January 2012 |
| Entering Long-Term Outage (LTO) | Japan | Ikata-2M (2-Loop)538 MW · 13 January 2012 |
| Kashiwazaki Kariwa-5BWR-51067 MW · 25 January 2012 |
| Shimane-2BWR-5791 MW · 27 January 2012 |
| Takahama-3M (3-Loop)830 MW · 20 February 2012 |
| Kashiwazaki Kariwa-6ABWR1315 MW · 26 March 2012 |
| Tomari-3M (3-Loop)866 MW · 5 May 2012 |
| South Korea | Wolsong-1CANDU 6628 MW · 20 November 2012 |
| Grid Reconnection (after LTO) | Canada | Bruce-1CANDU 791740 MW · 19 September 2012 |
| Bruce-2CANDU 791740 MW · 16 October 2012 |
| Closure | Canada | Gentilly-2CANDU 6645 MW · 28 December 2012 |
| Japan | Ikata-2M (2-Loop)538 MW · 13 January 2012 |
| Spain | Santa Maria De GaronaBWR-3460 MW · 19 December 2012 |
| United Kingdom | Oldbury A-1MAGNOX212 MW · 29 February 2012 |
| Wylfa-2MAGNOX495 MW · 26 April 2012 |
| United States | San Onofre-2CE 2LP (DRYAMB)1087 MW · 9 January 2012 |
| San Onofre-3CE 2LP (DRYAMB)1087 MW · 31 January 2012 |
| 2011 | Construction Start | India | Rajasthan-7Horizontal Pressure Tube Type630 MW · 18 July 2011 |
| Rajasthan-8Horizontal Pressure Tube Type630 MW · 30 September 2011 |
| Pakistan | Chasnupp-3CNP-300315 MW · 4 March 2011 |
| Chasnupp-4CNP-300315 MW · 18 December 2011 |
| Construction Suspension or Cancellation | Japan | OhmaABWR1325 MW · 2011 |
| Shimane-3ABWR1325 MW · 2011 |
| Grid Connection | China | Ling Ao-4CPR-10001007 MW · 3 May 2011 |
| CEFRBN-2020 MW · 21 July 2011 |
| Qinshan 2-4CNP-600619 MW · 25 November 2011 |
| India | Kaiga-4Horizontal Pressure Tube Type202 MW · 19 January 2011 |
| Iran | Bushehr-1VVER-1000/V-446915 MW · 3 September 2011 |
| Pakistan | Chasnupp-2CNP-300300 MW · 14 March 2011 |
| Russia | Kalinin-4VVER-1000/V-320950 MW · 24 November 2011 |
| Entering Long-Term Outage (LTO) | Japan | Takahama-1M (3-Loop)780 MW · 10 January 2011 |
| Genkai-2M (2-Loop)529 MW · 29 January 2011 |
| Higashi Dori-1BWR-51067 MW · 6 February 2011 |
| Shika-1BWR-5505 MW · 1 March 2011 |
| Onagawa-1BWR-4498 MW · 11 March 2011 |
| Onagawa-3BWR-5796 MW · 11 March 2011 |
| Shika-2ABWR1304 MW · 11 March 2011 |
| Tokai-2BWR-51056 MW · 11 March 2011 |
| Tomari-1M (2-Loop)550 MW · 22 April 2011 |
| Ikata-3M (3-Loop)846 MW · 29 April 2011 |
| Tsuruga-2M (4-Loop)1115 MW · 7 May 2011 |
| Sendai-1M (3-Loop)846 MW · 10 May 2011 |
| Hamaoka-4BWR-51092 MW · 13 May 2011 |
| Hamaoka-5ABWR1325 MW · 14 May 2011 |
| Mihama-3M (3-Loop)780 MW · 14 May 2011 |
| Takahama-4M (3-Loop)830 MW · 21 July 2011 |
| Kashiwazaki Kariwa-1BWR-51067 MW · 6 August 2011 |
| Kashiwazaki Kariwa-7ABWR1315 MW · 23 August 2011 |
| Tomari-2M (2-Loop)550 MW · 26 August 2011 |
| Sendai-2M (3-Loop)846 MW · 1 September 2011 |
| Takahama-2M (3-Loop)780 MW · 25 November 2011 |
| Ohi-2WH 4LP1120 MW · 16 December 2011 |
| Genkai-4M (4-Loop)1127 MW · 25 December 2011 |
| Closure | Germany | Biblis-A (KWB A)PWR1146 MW · 6 August 2011 |
| Biblis-B (KWB B)PWR1178 MW · 6 August 2011 |
| Isar-1 (KKI-1)BWR-69870 MW · 6 August 2011 |
| Neckarwestheim-1 (GKN-1)PWR791 MW · 6 August 2011 |
| Philippsburg-1 (KKP-1)BWR-69864 MW · 6 August 2011 |
| Unterweser (KKU)PWR1230 MW · 6 August 2011 |
| Japan | Tsuruga-1BWR-2341 MW · 26 January 2011 |
| Genkai-2M (2-Loop)529 MW · 29 January 2011 |
| Fukushima-Daiichi-1BWR-3439 MW · 11 March 2011 |
| Fukushima-Daiichi-2BWR-4760 MW · 11 March 2011 |
| Fukushima-Daiichi-3BWR-4760 MW · 11 March 2011 |
| Fukushima-Daiichi-4BWR-4760 MW · 11 March 2011 |
| Fukushima-Daiichi-5BWR-4760 MW · 11 March 2011 |
| Fukushima-Daiichi-6BWR-51047 MW · 11 March 2011 |
| Fukushima-Daini-1BWR-51067 MW · 11 March 2011 |
| Fukushima-Daini-2BWR-51067 MW · 11 March 2011 |
| Fukushima-Daini-3BWR-51067 MW · 11 March 2011 |
| Fukushima-Daini-4BWR-51067 MW · 11 March 2011 |
| Onagawa-1BWR-4498 MW · 11 March 2011 |
| Ohi-1WH 4LP1120 MW · 16 July 2011 |
| Ikata-1M (2-Loop)538 MW · 4 September 2011 |
| Genkai-1M (2-Loop)529 MW · 1 December 2011 |
| Ohi-2WH 4LP1120 MW · 16 December 2011 |
| Mihama-2M (2-Loop)500 MW · 18 December 2011 |
| United Kingdom | Oldbury A-2MAGNOX212 MW · 30 June 2011 |
| 2010 | Construction Start | Brazil | Angra-3Pre-Konvoi1340 MW · 1 June 2010 |
| China | Ningde-3CPR-10001018 MW · 8 January 2010 |
| Taishan-2EPR-17501660 MW · 15 April 2010 |
| Changjiang-1CNP-600601 MW · 25 April 2010 |
| Haiyang-2AP-10001126 MW · 20 June 2010 |
| Fangchenggang-1CPR-10001000 MW · 30 July 2010 |
| Ningde-4CPR-10001018 MW · 29 September 2010 |
| Yangjiang-3CPR-10001000 MW · 15 November 2010 |
| Changjiang-2CNP-600601 MW · 21 November 2010 |
| Fangchenggang-2CPR-10001000 MW · 23 December 2010 |
| Fuqing-3CPR-10001000 MW · 31 December 2010 |
| India | Kakrapar-3PHWR-700630 MW · 22 November 2010 |
| Kakrapar-4PHWR-700630 MW · 22 November 2010 |
| Japan | OhmaABWR1325 MW · 7 May 2010 |
| Russia | Leningrad 2-2VVER-1200/V-4911066 MW · 15 April 2010 |
| Construction Restart | Russia | Rostov-4VVER-1000/V-320950 MW · 2010 |
| Grid Connection | China | Ling Ao-3CPR-10001007 MW · 15 July 2010 |
| Qinshan 2-3CNP-600619 MW · 1 August 2010 |
| India | Rajasthan-6Horizontal Pressure Tube Type202 MW · 28 March 2010 |
| Russia | Rostov-2VVER-1000/V-320950 MW · 18 March 2010 |
| South Korea | Shin-Kori-1OPR-1000998 MW · 1 August 2010 |
| Entering Long-Term Outage (LTO) | Japan | Onagawa-2BWR-5796 MW · 6 November 2010 |
| Hamaoka-3BWR-51066 MW · 29 November 2010 |
| Ohi-1WH 4LP1120 MW · 10 December 2010 |
| Genkai-3M (4-Loop)1127 MW · 11 December 2010 |
| Grid Reconnection (after LTO) | Japan | Kashiwazaki Kariwa-1BWR-51067 MW · 2010 |
| Kashiwazaki Kariwa-5BWR-51067 MW · 2010 |
| Closure | Japan | Shimane-1BWR-3439 MW · 8 November 2010 |
| Mihama-1WH 2LP320 MW · 24 November 2010 |
| 2009 | Construction Start | China | Hongyanhe-3CPR-10001000 MW · 7 March 2009 |
| Sanmen-1AP-10001157 MW · 29 March 2009 |
| Yangjiang-2CPR-10001000 MW · 4 June 2009 |
| Fuqing-2CPR-10001000 MW · 17 June 2009 |
| Fangjiashan-2CPR-10001000 MW · 17 July 2009 |
| Hongyanhe-4CPR-10001061 MW · 15 August 2009 |
| Haiyang-1AP-10001126 MW · 24 September 2009 |
| Taishan-1EPR-17501660 MW · 28 October 2009 |
| Sanmen-2AP-10001157 MW · 15 December 2009 |
| Russia | Novovoronezh 2-2VVER-1200/V-392M1114 MW · 12 July 2009 |
| South Korea | Saeul-2APR-14001340 MW · 19 September 2009 |
| Construction Restart | Russia | Rostov-3VVER-1000/V-320950 MW · 2009 |
| Slovakia | Mochovce-3VVER-440/V-213440 MW · 2009 |
| Mochovce-4VVER-440/V-213440 MW · 2009 |
| Grid Connection | India | Rajasthan-5Horizontal Pressure Tube Type202 MW · 22 December 2009 |
| Japan | Tomari-3M (3-Loop)866 MW · 20 March 2009 |
| Grid Reconnection (after LTO) | Japan | Kashiwazaki Kariwa-6ABWR1315 MW · 2009 |
| Kashiwazaki Kariwa-7ABWR1315 MW · 2009 |
| Closure | France | PhénixPH-250233 MW · 6 March 2009 |
| Germany | Kruemmel (KKK)BWR-691260 MW · 9 July 2009 |
| Lithuania | Ignalina-2RBMK-15001500 MW · 31 December 2009 |
| United States | Crystal River-3B&W LLP (DRYAMB)818 MW · 26 September 2009 |
| 2008 | Construction Start | China | Ningde-1CPR-10001018 MW · 18 February 2008 |
| Hongyanhe-2CPR-10001061 MW · 28 March 2008 |
| Ningde-2CPR-10001018 MW · 12 November 2008 |
| Fuqing-1CPR-10001000 MW · 21 November 2008 |
| Yangjiang-1CPR-10001021 MW · 16 December 2008 |
| Fangjiashan-1CPR-10001000 MW · 26 December 2008 |
| Russia | Novovoronezh 2-1VVER-1200/V-392M1114 MW · 24 June 2008 |
| Leningrad 2-1VVER-1200/V-4911066 MW · 25 October 2008 |
| South Korea | Shin-Wolsong-2OPR-1000950 MW · 23 September 2008 |
| Saeul-1APR-14001400 MW · 16 October 2008 |
| Closure | Slovakia | Bohunice-2VVER-440/V-230382 MW · 31 December 2008 |
| 2007 | Construction Start | China | Qinshan 2-4CNP-600619 MW · 28 January 2007 |
| Hongyanhe-1CPR-10001061 MW · 18 August 2007 |
| France | Flamanville-3EPR1630 MW · 3 December 2007 |
| Japan | Shimane-3ABWR1325 MW · 12 October 2007 |
| Russia | Akademik Lomonosov-1KLT-40S 'Floating'32 MW · 15 April 2007 |
| Akademik Lomonosov-2KLT-40S 'Floating'32 MW · 15 April 2007 |
| South Korea | Shin-Kori-2OPR-1000995 MW · 5 June 2007 |
| Shin-Wolsong-1OPR-1000950 MW · 20 November 2007 |
| Construction Suspension or Cancellation | Russia | Balakovo-5VVER-1000/V-320950 MW · 2007 |
| Construction Restart | Russia | Kalinin-4VVER-1000/V-320950 MW · 2007 |
| United States | Watts Bar-2WH 4LP (ICECND)1165 MW · 2007 |
| Grid Connection | China | Tianwan-2VVER-1000/V-428990 MW · 14 May 2007 |
| India | Kaiga-3Horizontal Pressure Tube Type202 MW · 11 April 2007 |
| Romania | Cernavoda-2CANDU 6650 MW · 7 August 2007 |
| Entering Long-Term Outage (LTO) | Japan | Kashiwazaki Kariwa-1BWR-51067 MW · 2007 |
| Kashiwazaki Kariwa-2BWR-51067 MW · 5 July 2007 |
| Kashiwazaki Kariwa-3BWR-51067 MW · 16 July 2007 |
| Kashiwazaki Kariwa-4BWR-51067 MW · 16 July 2007 |
| Kashiwazaki Kariwa-6ABWR1315 MW · 2007 |
| Kashiwazaki Kariwa-7ABWR1315 MW · 2007 |
| Grid Reconnection (after LTO) | United States | Browns Ferry-1BWR-4 (Mark 1)798 MW · 2 June 2007 |
| Closure | Germany | Brunsbuettel (KKB)BWR-69770 MW · 18 July 2007 |
| 2006 | Construction Start | China | Qinshan 2-3CNP-600619 MW · 28 April 2006 |
| Ling Ao-4CPR-10001007 MW · 15 June 2006 |
| South Korea | Shin-Kori-1OPR-1000998 MW · 16 June 2006 |
| Grid Connection | China | Tianwan-1VVER-1000/V-428990 MW · 12 May 2006 |
| India | Tarapur-3Horizontal Pressure Tube Type502 MW · 15 June 2006 |
| Entering Long-Term Outage (LTO) | Japan | Kashiwazaki Kariwa-5BWR-51067 MW · 2006 |
| Closure | Bulgaria | Kozloduy-3VVER-440/V-230408 MW · 31 December 2006 |
| Kozloduy-4VVER-440/V-230408 MW · 31 December 2006 |
| Slovakia | Bohunice-1VVER-440/V-230380 MW · 31 December 2006 |
| Spain | Jose Cabrera-1 (Zorita)WH 1LP160 MW · 30 April 2006 |
| United Kingdom | Dungeness A-1MAGNOX289 MW · 31 December 2006 |
| Dungeness A-2MAGNOX289 MW · 31 December 2006 |
| Sizewell A-1MAGNOX326 MW · 31 December 2006 |
| Sizewell A-2MAGNOX326 MW · 31 December 2006 |
| 2005 | Construction Start | China | Ling Ao-3CPR-10001007 MW · 15 December 2005 |
| Finland | Olkiluoto-3EPR1600 MW · 12 August 2005 |
| Pakistan | Chasnupp-2CNP-300300 MW · 28 December 2005 |
| Grid Connection | India | Tarapur-4Horizontal Pressure Tube Type502 MW · 4 June 2005 |
| Japan | Higashi Dori-1BWR-51067 MW · 9 March 2005 |
| Shika-2ABWR1304 MW · 4 July 2005 |
| South Korea | Hanul-6OPR-1000950 MW · 7 January 2005 |
| Grid Reconnection (after LTO) | Canada | Pickering-1CANDU 500A514 MW · 26 September 2005 |
| Closure | Germany | Obrigheim (KWO)-345 MW · 11 May 2005 |
| Sweden | Barseback-2AA-II570 MW · 31 May 2005 |
| 2004 | Construction Start | India | PFBRPrototype470 MW · 23 October 2004 |
| Japan | Tomari-3M (3-Loop)866 MW · 18 November 2004 |
| Grid Connection | China | Qinshan 2-2CNP-600610 MW · 11 March 2004 |
| Japan | Hamaoka-5ABWR1325 MW · 30 April 2004 |
| Russia | Kalinin-3VVER-1000/V-320950 MW · 16 December 2004 |
| Ukraine | Khmelnytskyy-2VVER-1000/V-320950 MW · 7 August 2004 |
| Rivne-4VVER-1000/V-320950 MW · 10 October 2004 |
| Grid Reconnection (after LTO) | Canada | Bruce-3CANDU 750A750 MW · 2004 |
| Closure | India | Rajasthan-1Horizontal Pressure Tube Type145 MW · 31 December 2004 |
| Japan | Hamaoka-2BWR-5814 MW · 31 December 2004 |
| Lithuania | Ignalina-1RBMK-15001380 MW · 21 December 2004 |
| United Kingdom | Chapelcross-1MAGNOX60 MW · 29 June 2004 |
| Chapelcross-2MAGNOX60 MW · 29 June 2004 |
| Chapelcross-3MAGNOX60 MW · 29 June 2004 |
| Chapelcross-4MAGNOX60 MW · 29 June 2004 |
| 2003 | Construction Start | India | Rajasthan-6Horizontal Pressure Tube Type202 MW · 20 January 2003 |
| Construction Suspension or Cancellation | North Korea | Sinpo-1-1040 MW · 2003 |
| Grid Connection | China | Qinshan 3-2CANDU 6677 MW · 12 June 2003 |
| South Korea | Hanul-5OPR-1000950 MW · 18 December 2003 |
| Grid Reconnection (after LTO) | Canada | Pickering-4CANDU 500A514 MW · 21 September 2003 |
| Bruce-4CANDU 750A740 MW · 7 October 2003 |
| Closure | Germany | Stade (KKS)-662 MW · 14 November 2003 |
| Japan | Fugen ATRATR148 MW · 29 March 2003 |
| United Kingdom | Calder Hall-1MAGNOX60 MW · 31 March 2003 |
| Calder Hall-2MAGNOX60 MW · 31 March 2003 |
| Calder Hall-3MAGNOX60 MW · 31 March 2003 |
| Calder Hall-4MAGNOX60 MW · 31 March 2003 |
| 2002 | Construction Start | India | Kaiga-3Horizontal Pressure Tube Type202 MW · 30 March 2002 |
| Kudankulam-1VVER-1000/V-412932 MW · 31 March 2002 |
| Kaiga-4Horizontal Pressure Tube Type202 MW · 10 May 2002 |
| Kudankulam-2VVER-1000/V-412917 MW · 4 July 2002 |
| Rajasthan-5Horizontal Pressure Tube Type202 MW · 18 September 2002 |
| North Korea | Sinpo-1-1040 MW · 3 August 2002 |
| Grid Connection | China | Qinshan 2-1CNP-600610 MW · 6 February 2002 |
| Ling Ao-1M310950 MW · 26 February 2002 |
| Ling Ao-2M310950 MW · 14 September 2002 |
| Qinshan 3-1CANDU 6677 MW · 19 November 2002 |
| Czech Republic | Temelin-2VVER-1000/V-320912 MW · 29 April 2002 |
| South Korea | Hanbit-6OPR-1000950 MW · 31 December 2002 |
| Closure | Bulgaria | Kozloduy-1VVER-440/V-230432 MW · 31 December 2002 |
| Kozloduy-2VVER-440/V-230404 MW · 31 December 2002 |
| Russia | APS-1 ObninskAM-15 MW · 29 April 2002 |
| United Kingdom | Bradwell-2MAGNOX187 MW · 30 March 2002 |
| Bradwell-1MAGNOX187 MW · 31 March 2002 |
| 2001 | Construction Start | Japan | Shika-2ABWR1304 MW · 20 August 2001 |
| Construction Restart | Romania | Cernavoda-2CANDU 6650 MW · 2001 |
| Grid Connection | Japan | Onagawa-3BWR-5796 MW · 30 May 2001 |
| Russia | Rostov-1VVER-1000/V-320950 MW · 30 March 2001 |
| South Korea | Hanbit-5OPR-1000950 MW · 19 December 2001 |
| Closure | Japan | Hamaoka-1BWR-4515 MW · 31 December 2001 |
| 2000 | Construction Start | China | CEFRBN-2020 MW · 10 May 2000 |
| Tianwan-2VVER-1000/V-428990 MW · 20 October 2000 |
| India | Tarapur-4Horizontal Pressure Tube Type502 MW · 8 March 2000 |
| Tarapur-3Horizontal Pressure Tube Type502 MW · 12 May 2000 |
| Japan | Hamaoka-5ABWR1325 MW · 12 July 2000 |
| Higashi Dori-1BWR-51067 MW · 7 November 2000 |
| South Korea | Hanul-6OPR-1000950 MW · 20 September 2000 |
| Grid Connection | Brazil | Angra-2Pre-Konvoi1245 MW · 21 July 2000 |
| Czech Republic | Temelin-1VVER-1000/V-320912 MW · 21 December 2000 |
| India | Rajasthan-3Horizontal Pressure Tube Type202 MW · 10 March 2000 |
| Kaiga-1Horizontal Pressure Tube Type202 MW · 12 October 2000 |
| Rajasthan-4Horizontal Pressure Tube Type202 MW · 17 November 2000 |
| Pakistan | Chasnupp-1CNP-300300 MW · 13 June 2000 |
| Closure | United Kingdom | Hinkley Point A-1MAGNOX332 MW · 23 May 2000 |
| Hinkley Point A-2MAGNOX332 MW · 23 May 2000 |
| Ukraine | Chornobyl-3RBMK925 MW · 15 December 2000 |
| 1999 | Construction Start | China | Tianwan-1VVER-1000/V-428990 MW · 20 October 1999 |
| South Korea | Hanul-5OPR-1000950 MW · 1 October 1999 |
| Taiwan | Lungmen-1ABWR1300 MW · 31 March 1999 |
| Lungmen-2ABWR1300 MW · 30 August 1999 |
| Grid Connection | France | Civaux-2N4 REP 14501450 MW · 24 December 1999 |
| India | Kaiga-2Horizontal Pressure Tube Type202 MW · 2 December 1999 |
| Slovakia | Mochovce-2VVER-440/V-213408 MW · 20 December 1999 |
| South Korea | Wolsong-4CANDU 6669 MW · 21 May 1999 |
| Closure | Sweden | Barseback-1AA-II580 MW · 30 November 1999 |
| 1998 | Construction Start | China | Qinshan 3-1CANDU 6677 MW · 8 June 1998 |
| Qinshan 3-2CANDU 6677 MW · 25 September 1998 |
| Japan | Onagawa-3BWR-5796 MW · 23 January 1998 |
| Grid Connection | Slovakia | Mochovce-1VVER-440/V-213408 MW · 4 July 1998 |
| South Korea | Hanul-3OPR-1000950 MW · 6 January 1998 |
| Wolsong-3CANDU 6665 MW · 25 March 1998 |
| Hanul-4OPR-1000950 MW · 28 December 1998 |
| Entering Long-Term Outage (LTO) | Canada | Pickering-4CANDU 500A514 MW · 2 January 1998 |
| Bruce-4CANDU 750A740 MW · 16 March 1998 |
| Bruce-3CANDU 750A848 MW · 1 April 1998 |
| Closure | Japan | Tokai-1MAGNOX166 MW · 31 March 1998 |
| Kazakhstan | Aktau (BN-350)BN-350135 MW · 31 March 1998 |
| 1997 | Construction Start | China | Qinshan 2-2CNP-600610 MW · 1 April 1997 |
| Ling Ao-1M310950 MW · 15 May 1997 |
| Ling Ao-2M310950 MW · 28 November 1997 |
| South Korea | Hanbit-5OPR-1000950 MW · 29 June 1997 |
| Hanbit-6OPR-1000950 MW · 20 November 1997 |
| Grid Connection | France | Chooz B-2N4 REP 14501455 MW · 9 April 1997 |
| Civaux-1N4 REP 14501450 MW · 24 December 1997 |
| South Korea | Wolsong-2CANDU 6652 MW · 1 April 1997 |
| Entering Long-Term Outage (LTO) | Canada | Bruce-1CANDU 791740 MW · 16 October 1997 |
| Pickering-1CANDU 500A514 MW · 31 December 1997 |
| Closure | Canada | Pickering-3CANDU 500A514 MW · 27 December 1997 |
| Pickering-2CANDU 500A514 MW · 29 December 1997 |
| Netherlands | DodewaardGE Design54 MW · 26 March 1997 |
| United States | Zion-1WH 4LP880 MW · 28 February 1997 |
| Big Rock Point-75 MW · 29 August 1997 |
| 1996 | Construction Start | China | Qinshan 2-1CNP-600610 MW · 2 June 1996 |
| Construction Restart | Brazil | Angra-2Pre-Konvoi1245 MW · 1996 |
| Iran | Bushehr-1VVER-1000/V-446915 MW · 1996 |
| Slovakia | Mochovce-1VVER-440/V-213408 MW · 1996 |
| Mochovce-2VVER-440/V-213408 MW · 1996 |
| Grid Connection | France | Chooz B-1N4 REP 14501455 MW · 30 August 1996 |
| Japan | Kashiwazaki Kariwa-6ABWR1315 MW · 29 January 1996 |
| Genkai-4M (4-Loop)1127 MW · 12 November 1996 |
| Kashiwazaki Kariwa-7ABWR1315 MW · 17 December 1996 |
| Romania | Cernavoda-1CANDU 6650 MW · 11 July 1996 |
| United States | Watts Bar-1WH 4LP (ICECND)1218 MW · 6 February 1996 |
| Closure | France | SuperphénixNa-12001200 MW · 24 December 1996 |
| United States | Zion-2WH 4LP880 MW · 30 September 1996 |
| Haddam Neck-590 MW · 4 December 1996 |
| Maine Yankee-605 MW · 31 December 1996 |
| Ukraine | Chornobyl-1RBMK721 MW · 30 November 1996 |
| 1995 | Grid Connection | India | Kakrapar-2Horizontal Pressure Tube Type202 MW · 4 March 1995 |
| Japan | Monju-246 MW · 29 August 1995 |
| South Korea | Hanbit-4OPR-1000950 MW · 18 July 1995 |
| United Kingdom | Sizewell BSNUPPS1188 MW · 14 February 1995 |
| Ukraine | Zaporizhzhya-6VVER-1000/V-320950 MW · 19 October 1995 |
| Entering Long-Term Outage (LTO) | Canada | Bruce-2CANDU 791740 MW · 8 October 1995 |
| Japan | Monju-8 December 1995 |
| Grid Reconnection (after LTO) | Armenia | Armenian-2VVER-440/V-270375 MW · 5 November 1995 |
| United States | Browns Ferry-3BWR-4 (Mark 1)1065 MW · 1 November 1995 |
| Closure | Japan | Monju-8 December 1995 |
| United States | Millstone-1-682 MW · 31 December 1995 |
| 1994 | Construction Start | South Korea | Wolsong-3CANDU 6665 MW · 17 March 1994 |
| Wolsong-4CANDU 6669 MW · 22 July 1994 |
| Grid Connection | China | Daya Bay-2M310930 MW · 7 February 1994 |
| Japan | Ikata-3M (3-Loop)846 MW · 29 March 1994 |
| Onagawa-2BWR-5796 MW · 23 December 1994 |
| Mexico | Laguna Verde-2BWR-5780 MW · 11 November 1994 |
| South Korea | Hanbit-3OPR-1000950 MW · 30 October 1994 |
| Closure | France | Bugey-1UNGG540 MW · 27 May 1994 |
| Germany | Wuergassen (KWW)-640 MW · 26 August 1994 |
| United Kingdom | Dounreay PFRPFR180 MW · 31 March 1994 |
| 1993 | Construction Start | Japan | Kashiwazaki Kariwa-7ABWR1315 MW · 1 July 1993 |
| Pakistan | Chasnupp-1CNP-300300 MW · 1 August 1993 |
| South Korea | Hanul-3OPR-1000950 MW · 21 July 1993 |
| Hanul-4OPR-1000950 MW · 1 November 1993 |
| Construction Suspension or Cancellation | Russia | Balakovo-6VVER-1000/V-320950 MW · 1993 |
| Bashkirsk-1-950 MW · 1993 |
| Bashkirsk-2-950 MW · 1993 |
| Kursk-6RBMK-1000925 MW · 1993 |
| Smolensk-4RBMK-1000925 MW · 1993 |
| South Uralsk-1BN-800750 MW · 1993 |
| South Uralsk-2BN-800750 MW · 1993 |
| Tatar-1 (Kama)VVER-1000/V-320950 MW · 1993 |
| Tatar-2 (Kama)VVER-1000/V-320950 MW · 1993 |
| Slovakia | Mochovce-1VVER-440/V-213408 MW · 1993 |
| Mochovce-2VVER-440/V-213408 MW · 1993 |
| Mochovce-3VVER-440/V-213440 MW · 1993 |
| Mochovce-4VVER-440/V-213440 MW · 1993 |
| Grid Connection | Canada | Darlington-4CANDU 850881 MW · 17 April 1993 |
| China | Daya Bay-1M310930 MW · 31 August 1993 |
| France | Golfech-2P4 REP 13001310 MW · 18 June 1993 |
| Japan | Shika-1BWR-5505 MW · 12 January 1993 |
| Hamaoka-4BWR-51092 MW · 27 January 1993 |
| Genkai-3M (4-Loop)1127 MW · 15 June 1993 |
| Kashiwazaki Kariwa-4BWR-51067 MW · 21 December 1993 |
| Russia | Balakovo-4VVER-1000/V-320950 MW · 11 April 1993 |
| United States | Comanche Peak-2WH 4LP (DRYAMB)1100 MW · 9 April 1993 |
| 1992 | Construction Start | Japan | Genkai-4M (4-Loop)1127 MW · 15 July 1992 |
| Kashiwazaki Kariwa-6ABWR1315 MW · 3 November 1992 |
| South Korea | Wolsong-2CANDU 6652 MW · 22 June 1992 |
| Construction Suspension or Cancellation | Cuba | Juragua-1VVER-440/V-318417 MW · 1992 |
| Juragua-2VVER-440/V-318417 MW · 1992 |
| Grid Connection | Canada | Darlington-3CANDU 850881 MW · 7 December 1992 |
| France | Penly-2P4 REP 13001330 MW · 1 February 1992 |
| India | Narora-2Horizontal Pressure Tube Type202 MW · 5 January 1992 |
| Kakrapar-1Horizontal Pressure Tube Type202 MW · 24 November 1992 |
| Japan | Ohi-4M (4-Loop)1127 MW · 19 June 1992 |
| Kashiwazaki Kariwa-3BWR-51067 MW · 8 December 1992 |
| Closure | France | St. Laurent A-2UNGG515 MW · 27 May 1992 |
| United States | Trojan-1068 MW · 9 November 1992 |
| San Onofre-1WH 3LP450 MW · 30 November 1992 |
| 1991 | Construction Start | France | Civaux-2N4 REP 14501450 MW · 1 April 1991 |
| Japan | Onagawa-2BWR-5796 MW · 12 April 1991 |
| Construction Suspension or Cancellation | Germany | KalkarSNR-300295 MW · 1991 |
| Stendal-1-900 MW · 1991 |
| Stendal-2-900 MW · 1991 |
| Russia | Kalinin-4VVER-1000/V-320950 MW · 1991 |
| Grid Connection | Bulgaria | Kozloduy-6VVER-1000/V-3201003 MW · 2 August 1991 |
| China | Qinshan-1CNP-300288 MW · 15 December 1991 |
| France | Cattenom-4P4 REP 13001300 MW · 27 May 1991 |
| Japan | Ohi-3M (4-Loop)1127 MW · 7 June 1991 |
| Grid Reconnection (after LTO) | United States | Browns Ferry-2BWR-4 (Mark 1)1065 MW · 24 May 1991 |
| Closure | France | Chooz A (Ardennes)CHOOZ-A282 MW · 30 October 1991 |
| Germany | KNK IiPrototype17 MW · 23 August 1991 |
| United Kingdom | Trawsfynydd-2MAGNOX293 MW · 4 February 1991 |
| Trawsfynydd-1MAGNOX293 MW · 6 February 1991 |
| United States | Yankee NPSPWR185 MW · 1 October 1991 |
| Ukraine | Chornobyl-2RBMK1000 MW · 11 October 1991 |
| 1990 | Construction Start | India | Rajasthan-3Horizontal Pressure Tube Type202 MW · 1 February 1990 |
| Rajasthan-4Horizontal Pressure Tube Type202 MW · 1 October 1990 |
| Japan | Kashiwazaki Kariwa-4BWR-51067 MW · 5 March 1990 |
| Ikata-3M (3-Loop)846 MW · 1 October 1990 |
| South Korea | Hanbit-4OPR-1000950 MW · 26 May 1990 |
| Construction Suspension or Cancellation | Czech Republic | Temelin-3VVER-1000/V-320892 MW · 1990 |
| Temelin-4VVER-1000/V-320892 MW · 1990 |
| Germany | Greifswald-6VVER-440/V-213408 MW · 1990 |
| Greifswald-7VVER-440/V-213408 MW · 1990 |
| Greifswald-8VVER-440/V-213408 MW · 1990 |
| Poland | Zarnowiec-1VVER-440/V-213427 MW · 1990 |
| Zarnowiec-2VVER-440/V-213427 MW · 1990 |
| Romania | Cernavoda-2CANDU 6650 MW · 1990 |
| Cernavoda-3CANDU 6655 MW · 1990 |
| Cernavoda-4CANDU 6655 MW · 1990 |
| Cernavoda-5CANDU 6655 MW · 1990 |
| Russia | Rostov-3VVER-1000/V-320950 MW · 1990 |
| Ukraine | Khmelnytskyy-3VVER-1000/V-392B950 MW · 1990 |
| Khmelnytskyy-4VVER-1000/V-392B950 MW · 1990 |
| Grid Connection | Canada | Darlington-2CANDU 850881 MW · 15 January 1990 |
| Darlington-1CANDU 850881 MW · 19 December 1990 |
| France | Penly-1P4 REP 13001330 MW · 4 May 1990 |
| Golfech-1P4 REP 13001310 MW · 7 June 1990 |
| Cattenom-3P4 REP 13001300 MW · 6 July 1990 |
| Japan | Kashiwazaki Kariwa-2BWR-51067 MW · 8 February 1990 |
| Tomari-2M (2-Loop)550 MW · 27 August 1990 |
| Russia | Smolensk-3RBMK-1000925 MW · 17 January 1990 |
| United States | Comanche Peak-1WH 4LP (DRYAMB)1150 MW · 24 April 1990 |
| Seabrook-1WH 4LP (DRYAMB)1149 MW · 29 May 1990 |
| Closure | France | St. Laurent A-1UNGG480 MW · 18 April 1990 |
| Chinon A-3UNGG500 MW · 15 June 1990 |
| Germany | Greifswald-1 (KGR-1)VVER-440/V-230408 MW · 14 February 1990 |
| Greifswald-2 (KGR-2)VVER-440/V-230408 MW · 14 February 1990 |
| Greifswald-3 (KGR-3)VVER-440/V-230408 MW · 28 February 1990 |
| Rheinsberg (KKR)VVER-7062 MW · 1 June 1990 |
| Greifswald-4 (KGR-4)VVER-440/V-230408 MW · 22 July 1990 |
| Russia | Beloyarsk-2AMB-200160 MW · 1 January 1990 |
| Novovoronezh-2VVER V-120365 MW · 29 August 1990 |
| Spain | Vandellos-1UNGG480 MW · 31 July 1990 |
| United Kingdom | Hunterston A-1MAGNOX170 MW · 30 March 1990 |
| Winfrith SGHWRSGHWR100 MW · 11 September 1990 |
| 1989 | Construction Start | India | Kaiga-1Horizontal Pressure Tube Type202 MW · 1 September 1989 |
| Kaiga-2Horizontal Pressure Tube Type202 MW · 1 December 1989 |
| Japan | Kashiwazaki Kariwa-3BWR-51067 MW · 7 March 1989 |
| Shika-1BWR-5505 MW · 1 July 1989 |
| Hamaoka-4BWR-51092 MW · 13 October 1989 |
| South Korea | Hanbit-3OPR-1000950 MW · 23 December 1989 |
| Construction Suspension or Cancellation | United States | Grand Gulf-2-1250 MW · 1989 |
| Ukraine | Crimea-1VVER-1000/V-320953 MW · 1989 |
| South Ukraine-4VVER-1000/V-320950 MW · 1989 |
| Grid Connection | Germany | Neckarwestheim-2 (GKN-2)Konvoi1225 MW · 3 January 1989 |
| Greifswald-5 (KGR-5)VVER-440/V-213408 MW · 24 April 1989 |
| India | Narora-1Horizontal Pressure Tube Type202 MW · 29 July 1989 |
| Japan | Kashiwazaki Kariwa-5BWR-51067 MW · 12 September 1989 |
| Mexico | Laguna Verde-1BWR-5780 MW · 13 April 1989 |
| South Korea | Hanul-2CP1903 MW · 14 April 1989 |
| United Kingdom | Torness-2AGR654 MW · 3 February 1989 |
| United States | Vogtle-2WH 4LP (DRYAMB)1101 MW · 10 April 1989 |
| South Texas-2WH 4LP (DRYAMB)1250 MW · 11 April 1989 |
| Limerick-2BWR-4 (Mark 2)1055 MW · 1 September 1989 |
| Ukraine | Zaporizhzhya-5VVER-1000/V-320950 MW · 14 August 1989 |
| South Ukraine-3VVER-1000/V-320950 MW · 20 September 1989 |
| Entering Long-Term Outage (LTO) | Armenia | Armenian-2VVER-440/V-270375 MW · 18 March 1989 |
| Closure | Armenia | Armenian-1VVER-440/V-270376 MW · 25 February 1989 |
| Germany | Greifswald-5 (KGR-5)VVER-440/V-213408 MW · 24 November 1989 |
| United Kingdom | Berkeley-1MAGNOX167 MW · 31 March 1989 |
| Hunterston A-2MAGNOX170 MW · 31 December 1989 |
| United States | Rancho Seco-1-913 MW · 7 June 1989 |
| Fort St. Vrain-330 MW · 29 August 1989 |
| 1988 | Construction Start | China | Daya Bay-2M310930 MW · 7 April 1988 |
| France | Civaux-1N4 REP 14501450 MW · 15 October 1988 |
| Japan | Genkai-3M (4-Loop)1127 MW · 1 June 1988 |
| Ohi-4M (4-Loop)1127 MW · 13 June 1988 |
| Russia | Balakovo-6VVER-1000/V-320950 MW · 1 May 1988 |
| Tatar-2 (Kama)VVER-1000/V-320950 MW · 1 May 1988 |
| United Kingdom | Sizewell BSNUPPS1188 MW · 18 July 1988 |
| Construction Suspension or Cancellation | Italy | CireneFull Scale Prototype35 MW · 1988 |
| Montalto Di Castro-1-982 MW · 1988 |
| Montalto Di Castro-2-982 MW · 1988 |
| Lithuania | Ignalina-3RBMK1380 MW · 1988 |
| Russia | Rostov-4VVER-1000/V-320950 MW · 1988 |
| United States | Bellefonte-1-1235 MW · 1988 |
| Bellefonte-2-1235 MW · 1988 |
| Seabrook-2-1149 MW · 1988 |
| Ukraine | Chornobyl-5RBMK950 MW · 1988 |
| Chornobyl-6RBMK950 MW · 1988 |
| Grid Connection | France | Belleville-2P4 REP 13001310 MW · 6 July 1988 |
| Nogent-2P4 REP 13001310 MW · 14 December 1988 |
| Germany | Isar-2 (KKI-2)Konvoi1285 MW · 22 January 1988 |
| Emsland (KKE)Konvoi1242 MW · 19 April 1988 |
| Japan | Shimane-2BWR-5789 MW · 11 July 1988 |
| Tomari-1M (2-Loop)550 MW · 6 December 1988 |
| Russia | Balakovo-3VVER-1000/V-320950 MW · 25 December 1988 |
| South Korea | Hanul-1CP1903 MW · 7 April 1988 |
| Spain | Trillo-1PWR 3 Loops990 MW · 23 May 1988 |
| United Kingdom | Torness-1AGR654 MW · 25 May 1988 |
| Heysham B-1AGR615 MW · 12 July 1988 |
| Heysham B-2AGR615 MW · 11 November 1988 |
| United States | South Texas-1WH 4LP (DRYAMB)1250 MW · 30 March 1988 |
| Braidwood-2WH 4LP (DRYAMB)1120 MW · 25 May 1988 |
| Closure | Germany | THTR-300Pebble Bed Reactor301 MW · 20 April 1988 |
| Muelheim-Kaerlich (KMK)PWR1165 MW · 9 September 1988 |
| AVR Juelich (AVR)Pebble Bed Reactor Prototype15 MW · 31 December 1988 |
| Russia | Novovoronezh-1VVER V-120197 MW · 16 February 1988 |
| United Kingdom | Berkeley-2MAGNOX167 MW · 26 October 1988 |
| 1987 | Construction Start | Bulgaria | Belene-1VVER-1000/V-466953 MW · 1 January 1987 |
| Belene-2VVER-1000/V-466953 MW · 31 March 1987 |
| China | Daya Bay-1M310930 MW · 7 August 1987 |
| Czech Republic | Temelin-1VVER-1000/V-320912 MW · 1 February 1987 |
| Temelin-2VVER-1000/V-320912 MW · 1 February 1987 |
| Japan | Ohi-3M (4-Loop)1127 MW · 3 October 1987 |
| Romania | Cernavoda-5CANDU 6655 MW · 12 May 1987 |
| Russia | Balakovo-5VVER-1000/V-320950 MW · 1 April 1987 |
| Tatar-1 (Kama)VVER-1000/V-320950 MW · 1 April 1987 |
| Ukraine | South Ukraine-4VVER-1000/V-320950 MW · 1 January 1987 |
| Khmelnytskyy-4VVER-1000/V-392B950 MW · 1 February 1987 |
| Grid Connection | Bulgaria | Kozloduy-5VVER-1000/V-3201003 MW · 29 November 1987 |
| Canada | Bruce-8CANDU 750B795 MW · 9 March 1987 |
| Czech Republic | Dukovany-4VVER-440/V-213420 MW · 11 June 1987 |
| France | Cattenom-2P4 REP 13001300 MW · 17 September 1987 |
| Belleville-1P4 REP 13001310 MW · 14 October 1987 |
| Nogent-1P4 REP 13001310 MW · 21 October 1987 |
| Chinon B-4CP2905 MW · 14 November 1987 |
| Hungary | Paks-4VVER-440/V-213410 MW · 16 August 1987 |
| Japan | Hamaoka-3BWR-51056 MW · 20 January 1987 |
| Lithuania | Ignalina-2RBMK-15001500 MW · 20 August 1987 |
| Russia | Balakovo-2VVER-1000/V-320950 MW · 8 October 1987 |
| Spain | Vandellos-2WH 3LP930 MW · 12 December 1987 |
| United States | Shearon Harris-1WH 3LP (DRYAMB)900 MW · 19 January 1987 |
| Byron-2WH 4LP (DRYAMB)1120 MW · 6 February 1987 |
| Vogtle-1WH 4LP (DRYAMB)1122 MW · 27 March 1987 |
| Clinton-1BWR-6 (Mark 3)950 MW · 24 April 1987 |
| Braidwood-1WH 4LP (DRYAMB)1120 MW · 12 July 1987 |
| Nine Mile Point-2BWR-5 (Mark 2)1100 MW · 8 August 1987 |
| Beaver Valley-2WH 3LP (DRYSUB)836 MW · 17 August 1987 |
| Palo Verde-3CE80 2LP (DRYAMB)1304 MW · 28 November 1987 |
| Ukraine | Zaporizhzhya-4VVER-1000/V-320950 MW · 18 December 1987 |
| Khmelnytskyy-1VVER-1000/V-320950 MW · 31 December 1987 |
| Closure | Belgium | BR-3Prototype10 MW · 30 June 1987 |
| Canada | Rolphton NPDCANDU25 MW · 1 August 1987 |
| Italy | Enrico Fermi (Trino)WH 4LP256 MW · 30 March 1987 |
| United States | LaCrosse-55 MW · 30 April 1987 |
| 1986 | Construction Start | Japan | Monju-246 MW · 10 May 1986 |
| Russia | South Uralsk-1BN-800750 MW · 1 January 1986 |
| South Uralsk-2BN-800750 MW · 1 January 1986 |
| Kalinin-4VVER-1000/V-320950 MW · 1 August 1986 |
| Kursk-6RBMK-1000925 MW · 1 August 1986 |
| Ukraine | Khmelnytskyy-3VVER-1000/V-392B950 MW · 1 March 1986 |
| Zaporizhzhya-6VVER-1000/V-320950 MW · 1 June 1986 |
| Rivne-4VVER-1000/V-320950 MW · 1 August 1986 |
| Construction Suspension or Cancellation | Brazil | Angra-2Pre-Konvoi1245 MW · 1986 |
| Philippines | Bnpp-1WH 2LP620 MW · 1986 |
| United States | Midland-1-491 MW · 1986 |
| Midland-2-816 MW · 1986 |
| Grid Connection | Canada | Pickering-8CANDU 500B516 MW · 21 January 1986 |
| Bruce-7CANDU 750B822 MW · 22 February 1986 |
| Czech Republic | Dukovany-2VVER-440/V-213420 MW · 30 January 1986 |
| Dukovany-3VVER-440/V-213420 MW · 14 November 1986 |
| France | SuperphénixNa-12001200 MW · 14 January 1986 |
| Paluel-4P4 REP 13001330 MW · 11 April 1986 |
| St. Alban-2P4 REP 13001335 MW · 3 July 1986 |
| Flamanville-2P4 REP 13001330 MW · 18 July 1986 |
| Chinon B-3CP2905 MW · 20 October 1986 |
| Cattenom-1P4 REP 13001300 MW · 13 November 1986 |
| Germany | Muelheim-Kaerlich (KMK)PWR1219 MW · 14 March 1986 |
| Brokdorf (KBR)Pre-Konvoi1307 MW · 14 October 1986 |
| Hungary | Paks-3VVER-440/V-213410 MW · 28 September 1986 |
| Japan | Tsuruga-2M (4-Loop)1115 MW · 19 June 1986 |
| Fukushima-Daini-4BWR-51067 MW · 17 December 1986 |
| Russia | Kalinin-2VVER-1000/V-338950 MW · 3 December 1986 |
| South Korea | Hanbit-1WH F903 MW · 5 March 1986 |
| Hanbit-2WH F903 MW · 11 November 1986 |
| United States | Millstone-3WH 4LP (DRYSUB)1159 MW · 12 February 1986 |
| Catawba-2WH 4LP (ICECND)1145 MW · 18 May 1986 |
| Palo Verde-2CE80 2LP (DRYAMB)1304 MW · 20 May 1986 |
| Hope Creek-1BWR-4 (Mark 1)1067 MW · 1 August 1986 |
| Shoreham-809 MW · 1 August 1986 |
| Fermi-2BWR-4 (Mark 1)1093 MW · 21 September 1986 |
| Perry-1BWR-6 (Mark 3)1205 MW · 19 December 1986 |
| Ukraine | Zaporizhzhya-3VVER-1000/V-320950 MW · 10 December 1986 |
| Rivne-3VVER-1000/V-320950 MW · 21 December 1986 |
| Closure | Italy | CaorsoBWR-4 (Mark 2)548 MW · 30 October 1986 |
| LatinaMAGNOX155 MW · 1 November 1986 |
| United States | Shoreham-820 MW · 31 December 1986 |
| Ukraine | Chornobyl-4RBMK925 MW · 26 April 1986 |
| 1985 | Construction Start | Canada | Darlington-4CANDU 850881 MW · 1 July 1985 |
| China | Qinshan-1CNP-300288 MW · 20 March 1985 |
| Cuba | Juragua-2VVER-440/V-318417 MW · 1 February 1985 |
| Czech Republic | Temelin-3VVER-1000/V-320892 MW · 1 January 1985 |
| Temelin-4VVER-1000/V-320892 MW · 1 January 1985 |
| France | Chooz B-2N4 REP 14501455 MW · 31 December 1985 |
| India | Kakrapar-2Horizontal Pressure Tube Type202 MW · 1 April 1985 |
| Japan | Shimane-2BWR-5789 MW · 2 February 1985 |
| Tomari-1M (2-Loop)550 MW · 18 April 1985 |
| Tomari-2M (2-Loop)550 MW · 13 June 1985 |
| Kashiwazaki Kariwa-5BWR-51067 MW · 20 June 1985 |
| Kashiwazaki Kariwa-2BWR-51067 MW · 18 November 1985 |
| Lithuania | Ignalina-3RBMK1380 MW · 1 June 1985 |
| Romania | Cernavoda-4CANDU 6655 MW · 15 August 1985 |
| Russia | Beloyarsk-4 (BN-800)BN-800789 MW · 1 January 1985 |
| Kalinin-3VVER-1000/V-320950 MW · 1 October 1985 |
| Kursk-5RBMK-1000925 MW · 1 December 1985 |
| Slovakia | Mochovce-3VVER-440/V-213440 MW · 1 January 1985 |
| Mochovce-4VVER-440/V-213440 MW · 1 January 1985 |
| Ukraine | Khmelnytskyy-2VVER-1000/V-320950 MW · 1 February 1985 |
| South Ukraine-3VVER-1000/V-320950 MW · 1 February 1985 |
| Zaporizhzhya-5VVER-1000/V-320950 MW · 1 November 1985 |
| Construction Suspension or Cancellation | United States | Watts Bar-2WH 4LP (ICECND)1165 MW · 1985 |
| Grid Connection | Belgium | Doel-4WH 3LP1000 MW · 8 April 1985 |
| Tihange-3WH 3LP1020 MW · 15 June 1985 |
| Czech Republic | Dukovany-1VVER-440/V-213420 MW · 24 February 1985 |
| France | Gravelines-6CP1910 MW · 1 August 1985 |
| St. Alban-1P4 REP 13001335 MW · 30 August 1985 |
| Paluel-3P4 REP 13001330 MW · 30 September 1985 |
| Flamanville-1P4 REP 13001330 MW · 4 December 1985 |
| Germany | THTR-300Pebble Bed Reactor296 MW · 16 November 1985 |
| India | Madras-2 (Kalpakam-2)Horizontal Pressure Tube Type205 MW · 20 September 1985 |
| Japan | Kashiwazaki Kariwa-1BWR-51067 MW · 13 February 1985 |
| Sendai-2M (3-Loop)846 MW · 5 April 1985 |
| Russia | Smolensk-2RBMK-1000925 MW · 31 May 1985 |
| Kursk-4RBMK-1000925 MW · 2 December 1985 |
| Balakovo-1VVER-1000/V-320950 MW · 28 December 1985 |
| Slovakia | Bohunice-4VVER-440/V-213408 MW · 9 August 1985 |
| South Africa | Koeberg-2CP1921 MW · 25 July 1985 |
| South Korea | Kori-3WH F1001 MW · 22 January 1985 |
| Kori-4WH F903 MW · 15 November 1985 |
| Spain | Asco-2WH 3LP888 MW · 23 October 1985 |
| Sweden | Oskarshamn-3AA-IV, BWR-30001050 MW · 3 March 1985 |
| Forsmark-3AA-IV, BWR-30001050 MW · 5 March 1985 |
| Taiwan | Maanshan-2WH 3LP (WE 312)890 MW · 25 February 1985 |
| United Kingdom | Dungeness B-2AGR607 MW · 29 December 1985 |
| United States | Catawba-1WH 4LP (ICECND)1145 MW · 22 January 1985 |
| Byron-1WH 4LP (DRYAMB)1120 MW · 1 March 1985 |
| Waterford-3CE 2LP (DRYAMB)1104 MW · 18 March 1985 |
| Limerick-1BWR-4 (Mark 2)1055 MW · 13 April 1985 |
| Palo Verde-1CE80 2LP (DRYAMB)1221 MW · 10 June 1985 |
| Wolf CreekWH 4LP (DRYAMB)1170 MW · 12 June 1985 |
| Diablo Canyon-2WH 4LP (DRYAMB)1106 MW · 20 October 1985 |
| River Bend-1BWR-6 (Mark 3)966 MW · 3 December 1985 |
| Ukraine | South Ukraine-2VVER-1000/V-338950 MW · 6 January 1985 |
| Zaporizhzhya-2VVER-1000/V-320950 MW · 22 July 1985 |
| Entering Long-Term Outage (LTO) | United States | Browns Ferry-2BWR-4 (Mark 1)1065 MW · 1 March 1985 |
| Browns Ferry-3BWR-4 (Mark 1)1065 MW · 1 March 1985 |
| Browns Ferry-1BWR-4 (Mark 1)798 MW · 19 March 1985 |
| Closure | France | Chinon A-2UNGG230 MW · 14 June 1985 |
| EL-4 (Monts d'Arrée)MONTS-D'ARREE77 MW · 31 July 1985 |
| Germany | VAK KAHLBWR16 MW · 25 November 1985 |
| 1984 | Construction Start | Canada | Darlington-3CANDU 850881 MW · 1 September 1984 |
| France | Chooz B-1N4 REP 14501455 MW · 1 January 1984 |
| Penly-2P4 REP 13001330 MW · 1 August 1984 |
| Golfech-2P4 REP 13001310 MW · 1 October 1984 |
| Germany | Stendal-2-900 MW · 1 December 1984 |
| India | Kakrapar-1Horizontal Pressure Tube Type202 MW · 1 December 1984 |
| Poland | Zarnowiec-1VVER-440/V-213427 MW · 1 March 1984 |
| Zarnowiec-2VVER-440/V-213427 MW · 1 March 1984 |
| Romania | Cernavoda-3CANDU 6655 MW · 9 February 1984 |
| Russia | Balakovo-4VVER-1000/V-320950 MW · 1 April 1984 |
| Smolensk-3RBMK-1000925 MW · 1 May 1984 |
| Smolensk-4RBMK-1000925 MW · 1 October 1984 |
| Construction Suspension or Cancellation | Spain | Lemoniz-1-883 MW · 1984 |
| Lemoniz-2-883 MW · 1984 |
| Valdecaballeros-1-939 MW · 1984 |
| Valdecaballeros-2-939 MW · 1984 |
| United States | Hartsville A-1-1233 MW · 1984 |
| Hartsville A-2-1233 MW · 1984 |
| Marble Hill-1-1030 MW · 1984 |
| Marble Hill-2-1130 MW · 1984 |
| Perry-2-1205 MW · 1984 |
| River Bend-2-934 MW · 1984 |
| Yellow Creek-1-1285 MW · 1984 |
| Yellow Creek-2-1285 MW · 1984 |
| Zimmer-1-810 MW · 1984 |
| Grid Connection | Canada | Bruce-6CANDU 750B822 MW · 26 June 1984 |
| Pickering-7CANDU 500B516 MW · 17 November 1984 |
| Bruce-5CANDU 750B822 MW · 2 December 1984 |
| France | Cruas-3CP2880 MW · 14 May 1984 |
| Paluel-1P4 REP 13001330 MW · 22 June 1984 |
| Gravelines-5CP1910 MW · 28 August 1984 |
| Cruas-2CP2915 MW · 6 September 1984 |
| Paluel-2P4 REP 13001330 MW · 14 September 1984 |
| Cruas-4CP2880 MW · 27 October 1984 |
| Germany | Gundremmingen-B (GUN-B)BWR-721244 MW · 16 March 1984 |
| Grohnde (KWG)Pre-Konvoi1298 MW · 4 September 1984 |
| Gundremmingen-C (GUN-C)BWR-721249 MW · 2 November 1984 |
| Philippsburg-2 (KKP-2)PWR1268 MW · 17 December 1984 |
| Hungary | Paks-2VVER-440/V-213410 MW · 6 September 1984 |
| Japan | Takahama-3M (3-Loop)830 MW · 9 May 1984 |
| Takahama-4M (3-Loop)830 MW · 1 November 1984 |
| Fukushima-Daini-3BWR-51067 MW · 14 December 1984 |
| Russia | Kalinin-1VVER-1000/V-338950 MW · 9 May 1984 |
| Kola-4VVER-440/V-213411 MW · 11 October 1984 |
| Slovakia | Bohunice-3VVER-440/V-213408 MW · 20 August 1984 |
| South Africa | Koeberg-1CP1921 MW · 4 April 1984 |
| Spain | CofrentesBWR-6 (Mark 3)939 MW · 14 October 1984 |
| Switzerland | LeibstadtBWR-6960 MW · 24 May 1984 |
| Taiwan | Maanshan-1WH 3LP (WE 312)890 MW · 9 May 1984 |
| United Kingdom | Heysham A-2AGR611 MW · 11 October 1984 |
| Hartlepool A-2AGR600 MW · 31 October 1984 |
| United States | LaSalle-2BWR-5 (Mark 2)1078 MW · 20 April 1984 |
| ColumbiaBWR-5 (Mark 2)1100 MW · 27 May 1984 |
| Susquehanna-2BWR-4 (Mark 2)1065 MW · 3 July 1984 |
| Grand Gulf-1BWR-6 (Mark 3)1250 MW · 20 October 1984 |
| Callaway-1WH 4LP (DRYAMB)1171 MW · 24 October 1984 |
| Diablo Canyon-1WH 4LP (DRYAMB)1084 MW · 11 November 1984 |
| Ukraine | Zaporizhzhya-1VVER-1000/V-320950 MW · 10 December 1984 |
| Closure | Canada | Douglas PointCANDU 200220 MW · 4 May 1984 |
| France | G-3 (Marcoule)UNGG84 MW · 20 June 1984 |
| Germany | MZFR-58 MW · 3 May 1984 |
| 1983 | Construction Start | Cuba | Juragua-1VVER-440/V-318417 MW · 1 October 1983 |
| France | Cattenom-4P4 REP 13001300 MW · 28 September 1983 |
| Japan | Hamaoka-3BWR-51056 MW · 18 April 1983 |
| Romania | Cernavoda-2CANDU 6650 MW · 1 July 1983 |
| Russia | Bashkirsk-1-950 MW · 1 January 1983 |
| Rostov-3VVER-1000/V-320950 MW · 1 January 1983 |
| Rostov-4VVER-1000/V-320950 MW · 1 January 1983 |
| Rostov-2VVER-1000/V-320950 MW · 1 May 1983 |
| Bashkirsk-2-950 MW · 1 December 1983 |
| Slovakia | Mochovce-1VVER-440/V-213408 MW · 1 October 1983 |
| Mochovce-2VVER-440/V-213408 MW · 1 October 1983 |
| South Korea | Hanul-1CP1903 MW · 26 January 1983 |
| Hanul-2CP1903 MW · 5 July 1983 |
| Ukraine | Chornobyl-6RBMK950 MW · 1 January 1983 |
| Zaporizhzhya-4VVER-1000/V-320950 MW · 1 April 1983 |
| Construction Suspension or Cancellation | United States | Cherokee-1-1280 MW · 1983 |
| Clinton-2-933 MW · 1983 |
| Harris-2C-900 MW · 1983 |
| WNP-1-1259 MW · 1983 |
| WNP-3-1240 MW · 1983 |
| Grid Connection | Argentina | EmbalseCANDU 6608 MW · 25 April 1983 |
| Canada | Pickering-6CANDU 500B516 MW · 8 November 1983 |
| France | Cruas-1CP2880 MW · 29 April 1983 |
| Blayais-4CP1910 MW · 16 May 1983 |
| Blayais-3CP1910 MW · 17 August 1983 |
| Chinon B-2CP2870 MW · 29 November 1983 |
| Germany | Kruemmel (KKK)BWR-691260 MW · 28 September 1983 |
| India | Madras-1 (Kalpakam-1)Horizontal Pressure Tube Type205 MW · 23 July 1983 |
| Japan | Fukushima-Daini-2BWR-51067 MW · 23 June 1983 |
| Sendai-1M (3-Loop)846 MW · 16 September 1983 |
| Onagawa-1BWR-4498 MW · 18 November 1983 |
| Lithuania | Ignalina-1RBMK-15001500 MW · 31 December 1983 |
| Russia | Kursk-3RBMK-1000925 MW · 17 October 1983 |
| South Korea | Kori-2WH F618 MW · 22 April 1983 |
| Spain | Asco-1WH 3LP888 MW · 13 August 1983 |
| Almaraz-2WH 3LP930 MW · 8 October 1983 |
| United Kingdom | Dungeness B-1AGR607 MW · 3 April 1983 |
| Heysham A-1AGR611 MW · 9 July 1983 |
| Hartlepool A-1AGR625 MW · 1 August 1983 |
| United States | McGuire-2WH 4LP (ICECND)1180 MW · 23 May 1983 |
| St. Lucie-2CE 2LP (DRYAMB)830 MW · 13 June 1983 |
| San Onofre-3CE 2LP (DRYAMB)1070 MW · 25 September 1983 |
| Ukraine | Chornobyl-4RBMK925 MW · 22 December 1983 |
| Closure | Russia | Beloyarsk-1AMB-100102 MW · 1 January 1983 |
| 1982 | Construction Start | Bulgaria | Kozloduy-6VVER-1000/V-3201003 MW · 1 April 1982 |
| Canada | Darlington-1CANDU 850881 MW · 1 April 1982 |
| France | Nogent-2P4 REP 13001310 MW · 1 January 1982 |
| Cattenom-3P4 REP 13001300 MW · 15 June 1982 |
| Penly-1P4 REP 13001330 MW · 1 September 1982 |
| Golfech-1P4 REP 13001310 MW · 17 November 1982 |
| Germany | Emsland (KKE)Konvoi1242 MW · 10 August 1982 |
| Isar-2 (KKI-2)Konvoi1285 MW · 15 September 1982 |
| Neckarwestheim-2 (GKN-2)Konvoi1225 MW · 9 November 1982 |
| Stendal-1-900 MW · 1 December 1982 |
| Italy | Montalto Di Castro-1-982 MW · 1 July 1982 |
| Montalto Di Castro-2-982 MW · 1 July 1982 |
| Japan | Tsuruga-2M (4-Loop)1115 MW · 6 November 1982 |
| Romania | Cernavoda-1CANDU 6650 MW · 1 July 1982 |
| Russia | Kalinin-2VVER-1000/V-338950 MW · 1 February 1982 |
| Balakovo-3VVER-1000/V-320950 MW · 1 November 1982 |
| Ukraine | Zaporizhzhya-3VVER-1000/V-320950 MW · 1 April 1982 |
| Crimea-1VVER-1000/V-320953 MW · 1 December 1982 |
| Construction Suspension or Cancellation | United States | Black Fox-1-1150 MW · 1982 |
| Black Fox-2-1150 MW · 1982 |
| Cherokee-2-1280 MW · 1982 |
| Cherokee-3-1280 MW · 1982 |
| Hartsville B-1-1233 MW · 1982 |
| Hartsville B-2-1233 MW · 1982 |
| North Anna-3C-907 MW · 1982 |
| Phipps Bend-1-1233 MW · 1982 |
| Phipps Bend-2-1233 MW · 1982 |
| WNP-4-1250 MW · 1982 |
| WNP-5-1240 MW · 1982 |
| Grid Connection | Belgium | Doel-3WH 3LP890 MW · 23 June 1982 |
| Tihange-2WH 3LP900 MW · 13 October 1982 |
| Brazil | Angra-1WH 2LP629 MW · 1 April 1982 |
| Bulgaria | Kozloduy-4VVER-440/V-230408 MW · 17 May 1982 |
| Canada | Point LepreauCANDU 6660 MW · 11 September 1982 |
| Gentilly-2CANDU 6645 MW · 4 December 1982 |
| Pickering-5CANDU 500B516 MW · 19 December 1982 |
| France | Blayais-2CP1910 MW · 17 July 1982 |
| Chinon B-1CP2870 MW · 30 November 1982 |
| Hungary | Paks-1VVER-440/V-213408 MW · 28 December 1982 |
| Russia | Smolensk-1RBMK-1000925 MW · 9 December 1982 |
| South Korea | Wolsong-1CANDU 6670 MW · 31 December 1982 |
| Sweden | Ringhals-4WH 3LP915 MW · 23 June 1982 |
| Taiwan | Kuosheng-2BWR-6951 MW · 29 June 1982 |
| United States | LaSalle-1BWR-5 (Mark 2)1078 MW · 4 September 1982 |
| San Onofre-2CE 2LP (DRYAMB)1070 MW · 20 September 1982 |
| Summer-1WH 3LP (DRYAMB)900 MW · 16 November 1982 |
| Susquehanna-1BWR-4 (Mark 2)1065 MW · 16 November 1982 |
| Ukraine | South Ukraine-1VVER-1000/V-302950 MW · 31 December 1982 |
| Closure | United States | ShippingportPLWBR60 MW · 1 October 1982 |
| 1981 | Construction Start | Argentina | Atucha-2PHWR KWU692 MW · 14 July 1981 |
| Canada | Darlington-2CANDU 850881 MW · 1 September 1981 |
| France | Chinon B-4CP2905 MW · 1 February 1981 |
| Nogent-1P4 REP 13001310 MW · 26 May 1981 |
| Japan | Takahama-4M (3-Loop)830 MW · 19 March 1981 |
| Fukushima-Daini-3BWR-51067 MW · 23 March 1981 |
| Fukushima-Daini-4BWR-51067 MW · 28 May 1981 |
| Sendai-2M (3-Loop)846 MW · 12 October 1981 |
| Russia | Kursk-4RBMK-1000925 MW · 1 May 1981 |
| Balakovo-2VVER-1000/V-320950 MW · 1 August 1981 |
| Rostov-1VVER-1000/V-320950 MW · 1 September 1981 |
| South Korea | Hanbit-1WH F903 MW · 4 June 1981 |
| Hanbit-2WH F903 MW · 1 December 1981 |
| Ukraine | Chornobyl-5RBMK950 MW · 1 January 1981 |
| Zaporizhzhya-2VVER-1000/V-320950 MW · 1 January 1981 |
| Khmelnytskyy-1VVER-1000/V-320950 MW · 1 November 1981 |
| Construction Suspension or Cancellation | United States | Bailly-660 MW · 1981 |
| Callaway-2C-1120 MW · 1981 |
| Harris-3C-900 MW · 1981 |
| Harris-4C-900 MW · 1981 |
| Hope Creek-2-1067 MW · 1981 |
| Grid Connection | France | St. Laurent B-1CP2915 MW · 21 January 1981 |
| Dampierre-3CP1890 MW · 30 January 1981 |
| Tricastin-3CP1915 MW · 10 February 1981 |
| St. Laurent B-2CP2880 MW · 1 June 1981 |
| Blayais-1CP1910 MW · 12 June 1981 |
| Tricastin-4CP1915 MW · 12 June 1981 |
| Gravelines-4CP1910 MW · 14 June 1981 |
| Dampierre-4CP1890 MW · 18 August 1981 |
| Germany | Grafenrheinfeld (KKG)Pre-Konvoi1225 MW · 21 December 1981 |
| Japan | Fukushima-Daini-1BWR-51067 MW · 31 July 1981 |
| Ikata-2M (2-Loop)538 MW · 19 August 1981 |
| Russia | Leningrad-4RBMK-1000925 MW · 9 February 1981 |
| Kola-3VVER-440/V-213411 MW · 24 March 1981 |
| Slovenia | KrskoWH 2LP632 MW · 2 October 1981 |
| Spain | Almaraz-1WH 3LP900 MW · 1 May 1981 |
| Sweden | Forsmark-2AA-III, BWR-2500900 MW · 26 January 1981 |
| Taiwan | Kuosheng-1BWR-6951 MW · 21 May 1981 |
| United States | Farley-2WH 3LP (DRYAMB)829 MW · 25 May 1981 |
| Salem-2WH 4LP (DRYAMB)1115 MW · 3 June 1981 |
| McGuire-1WH 4LP (ICECND)1180 MW · 12 September 1981 |
| Sequoyah-2WH 4LP (ICECND)1148 MW · 23 December 1981 |
| Ukraine | Chornobyl-3RBMK925 MW · 3 December 1981 |
| Rivne-2VVER-440/V-213384 MW · 30 December 1981 |
| Closure | United Kingdom | Windscale AGRAGR24 MW · 3 April 1981 |
| 1980 | Construction Start | Bulgaria | Kozloduy-5VVER-1000/V-3201003 MW · 1 July 1980 |
| France | Paluel-4P4 REP 13001330 MW · 1 February 1980 |
| Belleville-1P4 REP 13001310 MW · 1 May 1980 |
| Flamanville-2P4 REP 13001330 MW · 1 May 1980 |
| Cattenom-2P4 REP 13001300 MW · 28 July 1980 |
| Belleville-2P4 REP 13001310 MW · 1 August 1980 |
| Chinon B-3CP2905 MW · 1 October 1980 |
| Japan | Kashiwazaki Kariwa-1BWR-51067 MW · 5 June 1980 |
| Onagawa-1BWR-4498 MW · 8 July 1980 |
| Takahama-3M (3-Loop)830 MW · 12 December 1980 |
| Russia | Balakovo-1VVER-1000/V-320950 MW · 1 December 1980 |
| South Korea | Kori-4WH F903 MW · 1 April 1980 |
| Spain | Vandellos-2WH 3LP930 MW · 29 December 1980 |
| Sweden | Oskarshamn-3AA-IV, BWR-30001050 MW · 1 May 1980 |
| United Kingdom | Heysham B-1AGR615 MW · 1 August 1980 |
| Heysham B-2AGR615 MW · 1 August 1980 |
| Torness-1AGR654 MW · 1 August 1980 |
| Torness-2AGR654 MW · 1 August 1980 |
| Ukraine | Rivne-3VVER-1000/V-320950 MW · 1 February 1980 |
| Zaporizhzhya-1VVER-1000/V-320950 MW · 1 April 1980 |
| Construction Suspension or Cancellation | United States | Forked River-1070 MW · 1980 |
| North Anna-4C-907 MW · 1980 |
| Grid Connection | Armenia | Armenian-2VVER-440/V-270375 MW · 5 January 1980 |
| Bulgaria | Kozloduy-3VVER-440/V-230408 MW · 17 December 1980 |
| Finland | Olkiluoto-2AA-III, BWR-2500660 MW · 18 February 1980 |
| Loviisa-2VVER-440/V-213420 MW · 4 November 1980 |
| France | Gravelines-1CP1910 MW · 13 March 1980 |
| Dampierre-1CP1890 MW · 23 March 1980 |
| Tricastin-1CP1915 MW · 31 May 1980 |
| Tricastin-2CP1915 MW · 7 August 1980 |
| Gravelines-2CP1910 MW · 26 August 1980 |
| Dampierre-2CP1890 MW · 10 December 1980 |
| Gravelines-3CP1910 MW · 12 December 1980 |
| India | Rajasthan-2Horizontal Pressure Tube Type207 MW · 1 November 1980 |
| Japan | Genkai-2M (2-Loop)529 MW · 3 June 1980 |
| Russia | Beloyarsk-3 (BN-600)BN-600560 MW · 8 April 1980 |
| Novovoronezh-5VVER-1000/V-187950 MW · 31 May 1980 |
| Slovakia | Bohunice-2VVER-440/V-230408 MW · 26 March 1980 |
| Sweden | Forsmark-1AA-III, BWR-2500900 MW · 6 June 1980 |
| Ringhals-3WH 3LP915 MW · 7 September 1980 |
| United States | Sequoyah-1WH 4LP (ICECND)1148 MW · 22 July 1980 |
| North Anna-2WH 3LP (DRYSUB)907 MW · 25 August 1980 |
| Ukraine | Rivne-1VVER-440/V-213381 MW · 31 December 1980 |
| Closure | France | G-2 (Marcoule)UNGG40 MW · 2 February 1980 |
| 1979 | Construction Start | Canada | Bruce-7CANDU 750B822 MW · 1 May 1979 |
| Bruce-8CANDU 750B795 MW · 1 August 1979 |
| Czech Republic | Dukovany-1VVER-440/V-213420 MW · 1 January 1979 |
| Dukovany-2VVER-440/V-213420 MW · 1 January 1979 |
| Dukovany-3VVER-440/V-213420 MW · 1 March 1979 |
| Dukovany-4VVER-440/V-213420 MW · 1 March 1979 |
| France | St. Alban-1P4 REP 13001335 MW · 29 January 1979 |
| Paluel-3P4 REP 13001330 MW · 1 February 1979 |
| Cruas-3CP2880 MW · 15 April 1979 |
| St. Alban-2P4 REP 13001335 MW · 31 July 1979 |
| Cruas-4CP2880 MW · 1 October 1979 |
| Gravelines-5CP1910 MW · 1 October 1979 |
| Gravelines-6CP1910 MW · 1 October 1979 |
| Cattenom-1P4 REP 13001300 MW · 29 October 1979 |
| Flamanville-1P4 REP 13001330 MW · 1 December 1979 |
| Hungary | Paks-3VVER-440/V-213410 MW · 1 October 1979 |
| Paks-4VVER-440/V-213410 MW · 1 October 1979 |
| Italy | CireneFull Scale Prototype35 MW · 1 January 1979 |
| Japan | Fukushima-Daini-2BWR-51067 MW · 25 May 1979 |
| Sendai-1M (3-Loop)846 MW · 15 December 1979 |
| South Korea | Kori-3WH F1001 MW · 1 October 1979 |
| Spain | Trillo-1PWR 3 Loops990 MW · 17 August 1979 |
| Valdecaballeros-1-939 MW · 17 August 1979 |
| Valdecaballeros-2-939 MW · 17 August 1979 |
| Sweden | Forsmark-3AA-IV, BWR-30001050 MW · 1 January 1979 |
| Taiwan | Maanshan-2WH 3LP (WE 312)890 MW · 21 February 1979 |
| Ukraine | Chornobyl-4RBMK925 MW · 1 April 1979 |
| South Ukraine-2VVER-1000/V-338950 MW · 1 October 1979 |
| Grid Connection | France | Bugey-4CP0900 MW · 8 March 1979 |
| Bugey-5CP0900 MW · 31 July 1979 |
| Germany | Philippsburg-1 (KKP-1)BWR-69864 MW · 7 May 1979 |
| Greifswald-4 (KGR-4)VVER-440/V-230408 MW · 3 September 1979 |
| Japan | Fukushima-Daiichi-6BWR-51067 MW · 4 May 1979 |
| Russia | Kursk-2RBMK-1000925 MW · 28 January 1979 |
| Leningrad-3RBMK-1000925 MW · 7 December 1979 |
| Switzerland | GoesgenPWR 3 Loops920 MW · 2 February 1979 |
| Closure | United States | Three Mile Island-2-880 MW · 28 March 1979 |
| 1978 | Construction Start | Belgium | Tihange-3WH 3LP1020 MW · 1 November 1978 |
| Doel-4WH 3LP1000 MW · 1 December 1978 |
| Canada | Bruce-6CANDU 750B822 MW · 1 January 1978 |
| Bruce-5CANDU 750B822 MW · 1 June 1978 |
| France | Paluel-2P4 REP 13001330 MW · 1 January 1978 |
| Blayais-3CP1910 MW · 1 April 1978 |
| Blayais-4CP1910 MW · 1 April 1978 |
| Cruas-1CP2880 MW · 1 August 1978 |
| Cruas-2CP2915 MW · 15 November 1978 |
| Germany | Greifswald-7VVER-440/V-213408 MW · 1 December 1978 |
| Greifswald-8VVER-440/V-213408 MW · 1 December 1978 |
| Japan | Ikata-2M (2-Loop)538 MW · 1 August 1978 |
| Lithuania | Ignalina-2RBMK-15001500 MW · 1 January 1978 |
| Russia | Kursk-3RBMK-1000925 MW · 1 April 1978 |
| Taiwan | Maanshan-1WH 3LP (WE 312)890 MW · 21 August 1978 |
| United States | Harris-2C-900 MW · 1 January 1978 |
| Harris-3C-900 MW · 1 January 1978 |
| Harris-4C-900 MW · 1 January 1978 |
| Yellow Creek-1-1285 MW · 1 February 1978 |
| Yellow Creek-2-1285 MW · 1 February 1978 |
| Black Fox-1-1150 MW · 1 July 1978 |
| Black Fox-2-1150 MW · 1 July 1978 |
| Construction Suspension or Cancellation | Austria | Zwentendorf-692 MW · 1978 |
| Iran | Bushehr-1VVER-1000/V-446915 MW · 1978 |
| Bushehr-2VVER-1000/V-528 AES-92 GIII+974 MW · 1978 |
| Grid Connection | Canada | Bruce-4CANDU 750A750 MW · 21 December 1978 |
| Finland | Olkiluoto-1AA-III, BWR-2500660 MW · 2 September 1978 |
| France | Bugey-2CP0920 MW · 10 May 1978 |
| Bugey-3CP0920 MW · 21 September 1978 |
| Germany | KNK IiPrototype18 MW · 9 April 1978 |
| Unterweser (KKU)PWR1230 MW · 29 September 1978 |
| Italy | CaorsoBWR-4 (Mark 2)840 MW · 23 May 1978 |
| Japan | Fukushima-Daiichi-4BWR-4760 MW · 24 February 1978 |
| Tokai-2BWR-51056 MW · 13 March 1978 |
| Hamaoka-2BWR-5814 MW · 4 May 1978 |
| Fugen ATRATR148 MW · 29 July 1978 |
| Ohi-2WH 4LP1120 MW · 11 October 1978 |
| Slovakia | Bohunice-1VVER-440/V-230408 MW · 17 December 1978 |
| Taiwan | Chinshan-2BWR-4604 MW · 19 December 1978 |
| United States | Cook-2WH 4LP (ICECND)1100 MW · 22 March 1978 |
| North Anna-1WH 3LP (DRYSUB)907 MW · 17 April 1978 |
| Three Mile Island-2-906 MW · 21 April 1978 |
| Hatch-2BWR-4 (Mark 1)784 MW · 22 September 1978 |
| Ano-2 (Arkansas One-2)CE 2LP (DRYAMB)912 MW · 26 December 1978 |
| Ukraine | Chornobyl-2RBMK925 MW · 21 December 1978 |
| Closure | Italy | GariglianoBWR-1160 MW · 30 November 1978 |
| United States | Dresden-1-210 MW · 31 October 1978 |
| 1977 | Construction Start | France | Blayais-1CP1910 MW · 1 January 1977 |
| Blayais-2CP1910 MW · 1 January 1977 |
| Chinon B-1CP2870 MW · 1 March 1977 |
| Chinon B-2CP2870 MW · 1 March 1977 |
| Paluel-1P4 REP 13001330 MW · 15 August 1977 |
| Germany | Philippsburg-2 (KKP-2)PWR1268 MW · 7 July 1977 |
| India | Narora-2Horizontal Pressure Tube Type202 MW · 1 November 1977 |
| Japan | Genkai-2M (2-Loop)529 MW · 1 February 1977 |
| Lithuania | Ignalina-1RBMK-15001500 MW · 1 May 1977 |
| Mexico | Laguna Verde-2BWR-5780 MW · 1 June 1977 |
| Russia | Kalinin-1VVER-1000/V-338950 MW · 1 February 1977 |
| Kola-3VVER-440/V-213411 MW · 1 April 1977 |
| South Korea | Wolsong-1CANDU 6670 MW · 30 October 1977 |
| Kori-2WH F618 MW · 4 December 1977 |
| United States | Wolf CreekWH 4LP (DRYAMB)1170 MW · 1 January 1977 |
| River Bend-1BWR-6 (Mark 3)966 MW · 1 March 1977 |
| WNP-3-1240 MW · 1 April 1977 |
| WNP-5-1240 MW · 1 April 1977 |
| Marble Hill-1-1030 MW · 1 July 1977 |
| Marble Hill-2-1130 MW · 1 July 1977 |
| Phipps Bend-1-1233 MW · 1 October 1977 |
| Phipps Bend-2-1233 MW · 1 October 1977 |
| Ukraine | South Ukraine-1VVER-1000/V-302950 MW · 1 March 1977 |
| Construction Suspension or Cancellation | United States | Surry-3-859 MW · 1977 |
| Surry-4-859 MW · 1977 |
| Grid Connection | Canada | Bruce-1CANDU 791732 MW · 14 January 1977 |
| Bruce-3CANDU 750A750 MW · 12 December 1977 |
| Finland | Loviisa-1VVER-440/V-213420 MW · 8 February 1977 |
| France | Fessenheim-1CP0880 MW · 6 April 1977 |
| Fessenheim-2CP0880 MW · 7 October 1977 |
| Germany | Greifswald-3 (KGR-3)VVER-440/V-230408 MW · 24 October 1977 |
| Isar-1 (KKI-1)BWR-69870 MW · 3 December 1977 |
| Japan | Ikata-1M (2-Loop)538 MW · 17 February 1977 |
| Fukushima-Daiichi-5BWR-4760 MW · 22 September 1977 |
| Ohi-1WH 4LP1120 MW · 23 December 1977 |
| South Korea | Kori-1WH 60558 MW · 26 June 1977 |
| Sweden | Barseback-2AA-II570 MW · 21 March 1977 |
| Taiwan | Chinshan-1BWR-4604 MW · 16 November 1977 |
| United Kingdom | Hunterston B-2AGR624 MW · 31 March 1977 |
| United States | Crystal River-3B&W LLP (DRYAMB)825 MW · 30 January 1977 |
| Farley-1WH 3LP (DRYAMB)829 MW · 18 August 1977 |
| Davis Besse-1B&W LLP (DRYAMB)906 MW · 28 August 1977 |
| Ukraine | Chornobyl-1RBMK925 MW · 26 September 1977 |
| Closure | Canada | Gentilly-1HW BLWR 250266 MW · 1 June 1977 |
| Germany | Lingen (KWL)Fossil Fuel-Fired Superheater260 MW · 5 January 1977 |
| Gundremmingen-A (KRB A)BWR-1250 MW · 13 January 1977 |
| Slovakia | Bohunice A1KS 150110 MW · 22 February 1977 |
| United Kingdom | Dounreay DFRDFR15 MW · 1 March 1977 |
| 1976 | Construction Start | Belgium | Tihange-2WH 3LP900 MW · 1 April 1976 |
| Brazil | Angra-2Pre-Konvoi1245 MW · 1 January 1976 |
| Canada | Pickering-7CANDU 500B516 MW · 1 March 1976 |
| Pickering-8CANDU 500B516 MW · 1 September 1976 |
| France | Gravelines-4CP1910 MW · 1 April 1976 |
| St. Laurent B-1CP2915 MW · 1 May 1976 |
| St. Laurent B-2CP2880 MW · 1 July 1976 |
| SuperphénixNa-12001200 MW · 13 December 1976 |
| Germany | Brokdorf (KBR)Pre-Konvoi1307 MW · 1 January 1976 |
| Grohnde (KWG)Pre-Konvoi1298 MW · 1 June 1976 |
| Gundremmingen-B (GUN-B)BWR-721244 MW · 20 July 1976 |
| Gundremmingen-C (GUN-C)BWR-721249 MW · 20 July 1976 |
| Greifswald-5 (KGR-5)VVER-440/V-213408 MW · 1 December 1976 |
| Greifswald-6VVER-440/V-213408 MW · 1 December 1976 |
| India | Narora-1Horizontal Pressure Tube Type202 MW · 1 December 1976 |
| Iran | Bushehr-2VVER-1000/V-528 AES-92 GIII+974 MW · 1 February 1976 |
| Japan | Fukushima-Daini-1BWR-51067 MW · 16 March 1976 |
| Mexico | Laguna Verde-1BWR-5780 MW · 1 October 1976 |
| Philippines | Bnpp-1WH 2LP620 MW · 1 July 1976 |
| Russia | Smolensk-2RBMK-1000925 MW · 1 June 1976 |
| Kola-4VVER-440/V-213411 MW · 1 August 1976 |
| Slovakia | Bohunice-3VVER-440/V-213408 MW · 1 December 1976 |
| Bohunice-4VVER-440/V-213408 MW · 1 December 1976 |
| South Africa | Koeberg-1CP1921 MW · 1 July 1976 |
| Koeberg-2CP1921 MW · 1 July 1976 |
| Taiwan | Kuosheng-2BWR-6951 MW · 15 March 1976 |
| United States | Hope Creek-1BWR-4 (Mark 1)1067 MW · 1 March 1976 |
| Hope Creek-2-1067 MW · 1 March 1976 |
| Hartsville A-1-1233 MW · 1 April 1976 |
| Hartsville A-2-1233 MW · 1 April 1976 |
| Hartsville B-1-1233 MW · 1 April 1976 |
| Hartsville B-2-1233 MW · 1 April 1976 |
| Palo Verde-1CE80 2LP (DRYAMB)1221 MW · 1 May 1976 |
| Palo Verde-2CE80 2LP (DRYAMB)1304 MW · 1 June 1976 |
| Palo Verde-3CE80 2LP (DRYAMB)1304 MW · 1 June 1976 |
| St. Lucie-2CE 2LP (DRYAMB)830 MW · 1 June 1976 |
| Cherokee-1-1280 MW · 1 July 1976 |
| Cherokee-2-1280 MW · 1 July 1976 |
| Cherokee-3-1280 MW · 1 July 1976 |
| Seabrook-1WH 4LP (DRYAMB)1149 MW · 1 July 1976 |
| Seabrook-2-1149 MW · 1 July 1976 |
| Vogtle-1WH 4LP (DRYAMB)1122 MW · 1 August 1976 |
| Vogtle-2WH 4LP (DRYAMB)1101 MW · 1 August 1976 |
| Ukraine | Chornobyl-3RBMK925 MW · 1 March 1976 |
| Grid Connection | Armenia | Armenian-1VVER-440/V-270376 MW · 28 December 1976 |
| Canada | Bruce-2CANDU 791696 MW · 4 September 1976 |
| Germany | Biblis-B (KWB B)PWR1178 MW · 6 April 1976 |
| Neckarwestheim-1 (GKN-1)PWR805 MW · 3 June 1976 |
| Brunsbuettel (KKB)BWR-69770 MW · 13 July 1976 |
| Japan | Mihama-3M (3-Loop)780 MW · 19 February 1976 |
| Russia | Kursk-1RBMK-1000925 MW · 19 December 1976 |
| Bilibino-4EGP-611 MW · 27 December 1976 |
| United Kingdom | Hinkley Point B-2AGR625 MW · 5 February 1976 |
| Hunterston B-1AGR624 MW · 6 February 1976 |
| Hinkley Point B-1AGR625 MW · 30 October 1976 |
| United States | Indian Point-3WH 4LP (DRYAMB)965 MW · 27 April 1976 |
| St. Lucie-1CE 2LP (DRYAMB)830 MW · 7 May 1976 |
| Beaver Valley-1WH 3LP (DRYSUB)835 MW · 14 June 1976 |
| Browns Ferry-3BWR-4 (Mark 1)1065 MW · 12 September 1976 |
| Brunswick-1BWR-4 (Mark 1)821 MW · 4 December 1976 |
| Calvert Cliffs-2CE 2LP (DRYAMB)845 MW · 7 December 1976 |
| Fort St. Vrain-330 MW · 11 December 1976 |
| Salem-1WH 4LP (DRYAMB)1090 MW · 25 December 1976 |
| Closure | Japan | JPDRBWR-112 MW · 18 March 1976 |
| United States | Humboldt BayNatural cir.65 MW · 2 July 1976 |
| 1975 | Construction Start | Armenia | Armenian-2VVER-440/V-270375 MW · 1 July 1975 |
| Belgium | Doel-3WH 3LP890 MW · 1 January 1975 |
| Canada | Point LepreauCANDU 6660 MW · 1 May 1975 |
| Pickering-6CANDU 500B516 MW · 1 October 1975 |
| Finland | Olkiluoto-2AA-III, BWR-2500660 MW · 1 August 1975 |
| France | Dampierre-1CP1890 MW · 1 February 1975 |
| Gravelines-1CP1910 MW · 1 February 1975 |
| Gravelines-2CP1910 MW · 1 March 1975 |
| Dampierre-2CP1890 MW · 1 April 1975 |
| Tricastin-3CP1915 MW · 1 April 1975 |
| Tricastin-4CP1915 MW · 1 May 1975 |
| Dampierre-3CP1890 MW · 1 September 1975 |
| Dampierre-4CP1890 MW · 1 December 1975 |
| Gravelines-3CP1910 MW · 1 December 1975 |
| Germany | Grafenrheinfeld (KKG)Pre-Konvoi1225 MW · 1 January 1975 |
| Muelheim-Kaerlich (KMK)PWR1219 MW · 15 January 1975 |
| Iran | Bushehr-1VVER-1000/V-446915 MW · 1 May 1975 |
| Russia | Leningrad-4RBMK-1000925 MW · 1 February 1975 |
| Smolensk-1RBMK-1000925 MW · 1 October 1975 |
| Slovenia | KrskoWH 2LP632 MW · 30 March 1975 |
| Spain | Asco-2WH 3LP888 MW · 7 March 1975 |
| CofrentesBWR-6 (Mark 3)939 MW · 9 September 1975 |
| Sweden | Forsmark-2AA-III, BWR-2500900 MW · 1 January 1975 |
| Taiwan | Kuosheng-1BWR-6951 MW · 19 November 1975 |
| United States | Byron-1WH 4LP (DRYAMB)1120 MW · 1 April 1975 |
| Byron-2WH 4LP (DRYAMB)1120 MW · 1 April 1975 |
| Braidwood-1WH 4LP (DRYAMB)1120 MW · 1 August 1975 |
| Braidwood-2WH 4LP (DRYAMB)1120 MW · 1 August 1975 |
| Nine Mile Point-2BWR-5 (Mark 2)1100 MW · 1 August 1975 |
| River Bend-2-934 MW · 1 August 1975 |
| WNP-1-1259 MW · 1 August 1975 |
| WNP-4-1250 MW · 1 August 1975 |
| Callaway-1WH 4LP (DRYAMB)1171 MW · 1 September 1975 |
| South Texas-1WH 4LP (DRYAMB)1250 MW · 1 September 1975 |
| South Texas-2WH 4LP (DRYAMB)1250 MW · 1 September 1975 |
| Callaway-2C-1120 MW · 1 October 1975 |
| Clinton-1BWR-6 (Mark 3)950 MW · 1 October 1975 |
| Clinton-2-933 MW · 1 October 1975 |
| Grid Connection | Belgium | Tihange-1Framatome 3 Loops870 MW · 7 March 1975 |
| Doel-2WH 2LP392 MW · 21 August 1975 |
| Bulgaria | Kozloduy-2VVER-440/V-230408 MW · 27 September 1975 |
| Japan | Takahama-2M (3-Loop)780 MW · 17 January 1975 |
| Genkai-1M (2-Loop)529 MW · 14 February 1975 |
| Russia | Leningrad-2RBMK-1000925 MW · 11 July 1975 |
| Bilibino-3EGP-611 MW · 22 December 1975 |
| Sweden | Barseback-1AA-II570 MW · 15 May 1975 |
| United Kingdom | Dounreay PFRPFR234 MW · 10 January 1975 |
| United States | Calvert Cliffs-1CE 2LP (DRYAMB)845 MW · 3 January 1975 |
| FitzpatrickBWR-4 (Mark 1)821 MW · 1 February 1975 |
| Cook-1WH 4LP (ICECND)1030 MW · 10 February 1975 |
| Brunswick-2BWR-4 (Mark 1)821 MW · 29 April 1975 |
| Millstone-2CE 2LP (DRYAMB)870 MW · 9 November 1975 |
| Trojan-1130 MW · 23 December 1975 |
| 1974 | Construction Start | Argentina | EmbalseCANDU 6608 MW · 1 April 1974 |
| Canada | Gentilly-2CANDU 6645 MW · 1 April 1974 |
| Pickering-5CANDU 500B516 MW · 1 November 1974 |
| Finland | Olkiluoto-1AA-III, BWR-2500660 MW · 1 February 1974 |
| France | Bugey-4CP0900 MW · 1 June 1974 |
| Bugey-5CP0900 MW · 1 July 1974 |
| Tricastin-1CP1915 MW · 1 November 1974 |
| Tricastin-2CP1915 MW · 1 December 1974 |
| Germany | Kruemmel (KKK)BWR-691260 MW · 5 April 1974 |
| KNK IiPrototype18 MW · 1 September 1974 |
| Hungary | Paks-1VVER-440/V-213408 MW · 1 August 1974 |
| Paks-2VVER-440/V-213410 MW · 1 August 1974 |
| Japan | Hamaoka-2BWR-5814 MW · 14 June 1974 |
| Russia | Novovoronezh-5VVER-1000/V-187950 MW · 1 March 1974 |
| Spain | Lemoniz-1-883 MW · 14 March 1974 |
| Lemoniz-2-883 MW · 14 March 1974 |
| Asco-1WH 3LP888 MW · 16 May 1974 |
| Switzerland | LeibstadtBWR-6960 MW · 1 January 1974 |
| United States | Bailly-660 MW · 1 January 1974 |
| Shearon Harris-1WH 3LP (DRYAMB)900 MW · 1 January 1974 |
| Surry-3-859 MW · 1 January 1974 |
| Surry-4-859 MW · 1 January 1974 |
| San Onofre-2CE 2LP (DRYAMB)1070 MW · 1 March 1974 |
| San Onofre-3CE 2LP (DRYAMB)1070 MW · 1 March 1974 |
| Catawba-1WH 4LP (ICECND)1145 MW · 1 May 1974 |
| Catawba-2WH 4LP (ICECND)1145 MW · 1 May 1974 |
| Grand Gulf-1BWR-6 (Mark 3)1250 MW · 1 May 1974 |
| Grand Gulf-2-1250 MW · 1 May 1974 |
| Millstone-3WH 4LP (DRYSUB)1159 MW · 1 May 1974 |
| Beaver Valley-2WH 3LP (DRYSUB)836 MW · 3 May 1974 |
| Bellefonte-1-1235 MW · 1 September 1974 |
| Bellefonte-2-1235 MW · 1 September 1974 |
| Comanche Peak-1WH 4LP (DRYAMB)1150 MW · 1 October 1974 |
| Comanche Peak-2WH 4LP (DRYAMB)1100 MW · 1 October 1974 |
| Perry-1BWR-6 (Mark 3)1205 MW · 1 October 1974 |
| Perry-2-1205 MW · 1 October 1974 |
| Waterford-3CE 2LP (DRYAMB)1104 MW · 1 November 1974 |
| Grid Connection | Argentina | Atucha-1PHWR KWU319 MW · 19 March 1974 |
| Belgium | Doel-1WH 2LP392 MW · 28 August 1974 |
| Bulgaria | Kozloduy-1VVER-440/V-230408 MW · 24 July 1974 |
| Germany | Biblis-A (KWB A)PWR1146 MW · 25 August 1974 |
| Greifswald-2 (KGR-2)VVER-440/V-230408 MW · 23 December 1974 |
| Japan | Takahama-1M (3-Loop)780 MW · 27 March 1974 |
| Hamaoka-1BWR-4516 MW · 13 August 1974 |
| Fukushima-Daiichi-3BWR-4760 MW · 26 October 1974 |
| Russia | Bilibino-1EGP-611 MW · 12 January 1974 |
| Kola-2VVER-440/V-230411 MW · 9 December 1974 |
| Bilibino-2EGP-611 MW · 30 December 1974 |
| Sweden | Ringhals-2WH 3LP820 MW · 17 August 1974 |
| Oskarshamn-2AA-I580 MW · 2 October 1974 |
| Ringhals-1AA-I760 MW · 14 October 1974 |
| United States | Peach Bottom-2BWR-4 (Mark 1)1065 MW · 18 February 1974 |
| KewauneeWH 4LP (DRYAMB)535 MW · 8 April 1974 |
| CooperBWR-4 (Mark 1)778 MW · 10 May 1974 |
| Duane Arnold-1BWR-4 (Mark 1)538 MW · 19 May 1974 |
| Three Mile Island-1B&W LLP (DRYAMB)819 MW · 19 June 1974 |
| Ano-1 (Arkansas One-1)B&W LLP (DRYAMB)850 MW · 17 August 1974 |
| Browns Ferry-2BWR-4 (Mark 1)1065 MW · 28 August 1974 |
| Peach Bottom-3BWR-4 (Mark 1)1065 MW · 1 September 1974 |
| Oconee-3B&W LLP (DRYAMB)887 MW · 18 September 1974 |
| Rancho Seco-1-918 MW · 13 October 1974 |
| Hatch-1BWR-4 (Mark 1)777 MW · 11 November 1974 |
| Prairie Island-2WH 2LP (DRYAMB)530 MW · 21 December 1974 |
| Closure | Germany | Niederaichbach (KKN)Pressure Tube Reactor100 MW · 21 July 1974 |
| Sweden | AgestaPrototype12 MW · 2 June 1974 |
| United States | Indian Point-1PWR285 MW · 31 October 1974 |
| Peach Bottom-1-40 MW · 1 November 1974 |
| 1973 | Construction Start | Bulgaria | Kozloduy-3VVER-440/V-230408 MW · 1 October 1973 |
| Kozloduy-4VVER-440/V-230408 MW · 1 October 1973 |
| France | Bugey-3CP0920 MW · 1 September 1973 |
| Germany | KalkarSNR-300295 MW · 23 April 1973 |
| Japan | Fukushima-Daiichi-4BWR-4760 MW · 12 February 1973 |
| Ikata-1M (2-Loop)538 MW · 1 September 1973 |
| Tokai-2BWR-51056 MW · 3 October 1973 |
| Fukushima-Daiichi-6BWR-51067 MW · 26 October 1973 |
| Russia | Kursk-2RBMK-1000925 MW · 1 January 1973 |
| Leningrad-3RBMK-1000925 MW · 1 December 1973 |
| Spain | Almaraz-1WH 3LP900 MW · 2 July 1973 |
| Almaraz-2WH 3LP930 MW · 2 July 1973 |
| Sweden | Barseback-2AA-II570 MW · 1 January 1973 |
| Forsmark-1AA-III, BWR-2500900 MW · 1 June 1973 |
| Ringhals-4WH 3LP915 MW · 1 November 1973 |
| Switzerland | GoesgenPWR 3 Loops920 MW · 1 December 1973 |
| Taiwan | Chinshan-2BWR-4604 MW · 7 December 1973 |
| United States | Midland-1-491 MW · 1 March 1973 |
| Midland-2-816 MW · 1 March 1973 |
| Summer-1WH 3LP (DRYAMB)900 MW · 1 March 1973 |
| Watts Bar-1WH 4LP (ICECND)1218 MW · 20 July 1973 |
| Forked River-1070 MW · 1 August 1973 |
| LaSalle-1BWR-5 (Mark 2)1078 MW · 1 September 1973 |
| Watts Bar-2WH 4LP (ICECND)1165 MW · 1 September 1973 |
| LaSalle-2BWR-5 (Mark 2)1078 MW · 1 October 1973 |
| Susquehanna-1BWR-4 (Mark 2)1065 MW · 1 November 1973 |
| Susquehanna-2BWR-4 (Mark 2)1065 MW · 1 November 1973 |
| Ukraine | Chornobyl-2RBMK925 MW · 1 February 1973 |
| Rivne-1VVER-440/V-213381 MW · 1 August 1973 |
| Rivne-2VVER-440/V-213384 MW · 1 October 1973 |
| Grid Connection | Canada | Pickering-4CANDU 500A508 MW · 21 May 1973 |
| France | PhénixPH-250233 MW · 13 December 1973 |
| Germany | Niederaichbach (KKN)Pressure Tube Reactor100 MW · 1 January 1973 |
| Greifswald-1 (KGR-1)VVER-440/V-230440 MW · 17 December 1973 |
| Japan | Shimane-1BWR-3439 MW · 2 December 1973 |
| Fukushima-Daiichi-2BWR-4760 MW · 24 December 1973 |
| Kazakhstan | Aktau (BN-350)BN-350135 MW · 16 July 1973 |
| Netherlands | BorsseleKWU 2LP495 MW · 4 July 1973 |
| Russia | Kola-1VVER-440/V-230411 MW · 29 June 1973 |
| Leningrad-1RBMK-1000925 MW · 21 December 1973 |
| United States | Surry-2WH 3LP (DRYSUB)788 MW · 10 March 1973 |
| Oconee-1B&W LLP (DRYAMB)887 MW · 6 May 1973 |
| Turkey Point-4WH 3LP (DRYAMB)693 MW · 21 June 1973 |
| Indian Point-2WH 4LP (DRYAMB)873 MW · 26 June 1973 |
| Zion-1WH 4LP1040 MW · 28 June 1973 |
| Fort Calhoun-1CE 2LP478 MW · 25 August 1973 |
| Browns Ferry-1BWR-4 (Mark 1)1065 MW · 15 October 1973 |
| Prairie Island-1WH 2LP (DRYAMB)530 MW · 4 December 1973 |
| Oconee-2B&W LLP (DRYAMB)887 MW · 5 December 1973 |
| Zion-2WH 4LP1040 MW · 26 December 1973 |
| Zion-2WH 4LP1040 MW · 26 December 1973 |
| Closure | France | Chinon A-1UNGG70 MW · 16 April 1973 |
| 1972 | Construction Start | Canada | Bruce-3CANDU 750A750 MW · 1 July 1972 |
| Bruce-4CANDU 750A750 MW · 1 September 1972 |
| Finland | Loviisa-2VVER-440/V-213420 MW · 1 August 1972 |
| France | Fessenheim-2CP0880 MW · 1 February 1972 |
| Bugey-2CP0920 MW · 1 November 1972 |
| Germany | Biblis-B (KWB B)PWR1178 MW · 1 February 1972 |
| Neckarwestheim-1 (GKN-1)PWR805 MW · 1 February 1972 |
| Greifswald-3 (KGR-3)VVER-440/V-230408 MW · 1 April 1972 |
| Greifswald-4 (KGR-4)VVER-440/V-230408 MW · 1 April 1972 |
| Isar-1 (KKI-1)BWR-69870 MW · 1 May 1972 |
| Unterweser (KKU)PWR1230 MW · 1 July 1972 |
| India | Madras-2 (Kalpakam-2)Horizontal Pressure Tube Type205 MW · 1 October 1972 |
| Japan | Fugen ATRATR148 MW · 10 May 1972 |
| Fukushima-Daiichi-5BWR-4760 MW · 22 May 1972 |
| Mihama-3M (3-Loop)780 MW · 7 August 1972 |
| Ohi-1WH 4LP1120 MW · 26 October 1972 |
| Ohi-2WH 4LP1120 MW · 8 December 1972 |
| Russia | Kursk-1RBMK-1000925 MW · 1 June 1972 |
| Slovakia | Bohunice-1VVER-440/V-230408 MW · 24 April 1972 |
| Bohunice-2VVER-440/V-230408 MW · 24 April 1972 |
| South Korea | Kori-1WH 60558 MW · 27 April 1972 |
| Sweden | Ringhals-3WH 3LP915 MW · 1 September 1972 |
| Taiwan | Chinshan-1BWR-4604 MW · 2 June 1972 |
| United States | Hatch-2BWR-4 (Mark 1)784 MW · 1 February 1972 |
| ColumbiaBWR-5 (Mark 2)1100 MW · 1 August 1972 |
| Zimmer-1-810 MW · 1 October 1972 |
| Shoreham-809 MW · 1 November 1972 |
| Grid Connection | Canada | Pickering-3CANDU 500A508 MW · 3 May 1972 |
| France | Bugey-1UNGG540 MW · 15 April 1972 |
| Germany | Stade (KKS)-630 MW · 29 January 1972 |
| India | Rajasthan-1Horizontal Pressure Tube Type207 MW · 30 November 1972 |
| Japan | Mihama-2M (2-Loop)470 MW · 21 April 1972 |
| Russia | Novovoronezh-4VVER-440/V-179385 MW · 28 December 1972 |
| Slovakia | Bohunice A1KS 15093 MW · 1 October 1972 |
| Spain | Vandellos-1UNGG480 MW · 6 May 1972 |
| United States | Quad Cities-1BWR-3 (Mark 1)789 MW · 12 April 1972 |
| Quad Cities-2BWR-3 (Mark 1)789 MW · 23 May 1972 |
| Surry-1WH 3LP (DRYSUB)788 MW · 4 July 1972 |
| Pilgrim-1BWR-3 (Mark 1)655 MW · 19 July 1972 |
| Point Beach-2WH 2LP (DRYAMB)497 MW · 2 August 1972 |
| Vermont YankeeBWR-4 (Mark 1)514 MW · 20 September 1972 |
| Turkey Point-3WH 3LP (DRYAMB)693 MW · 2 November 1972 |
| Maine Yankee-825 MW · 8 November 1972 |
| Closure | United States | Saxton253 MW · 1 May 1972 |
| Fermi-1Liquid Metal FBR60 MW · 29 November 1972 |
| 1971 | Construction Start | Austria | Zwentendorf-692 MW · 1 May 1971 |
| Belgium | Doel-2WH 2LP392 MW · 1 September 1971 |
| Brazil | Angra-1WH 2LP629 MW · 1 May 1971 |
| Canada | Bruce-1CANDU 791732 MW · 1 June 1971 |
| Finland | Loviisa-1VVER-440/V-213420 MW · 1 May 1971 |
| France | Fessenheim-1CP0880 MW · 1 September 1971 |
| Germany | THTR-300Pebble Bed Reactor296 MW · 1 May 1971 |
| India | Madras-1 (Kalpakam-1)Horizontal Pressure Tube Type205 MW · 1 January 1971 |
| Japan | Takahama-2M (3-Loop)780 MW · 9 March 1971 |
| Hamaoka-1BWR-4516 MW · 10 June 1971 |
| Genkai-1M (2-Loop)529 MW · 15 September 1971 |
| Sweden | Barseback-1AA-II570 MW · 1 February 1971 |
| United States | North Anna-1WH 3LP (DRYSUB)907 MW · 1 February 1971 |
| McGuire-1WH 4LP (ICECND)1180 MW · 1 April 1971 |
| McGuire-2WH 4LP (ICECND)1180 MW · 1 April 1971 |
| North Anna-3C-907 MW · 1 June 1971 |
| Ano-2 (Arkansas One-2)CE 2LP (DRYAMB)912 MW · 1 July 1971 |
| North Anna-4C-907 MW · 1 December 1971 |
| Grid Connection | Canada | Pickering-1CANDU 500A508 MW · 4 April 1971 |
| Gentilly-1HW BLWR 250250 MW · 5 April 1971 |
| Pickering-2CANDU 500A508 MW · 6 October 1971 |
| France | St. Laurent A-2UNGG515 MW · 9 August 1971 |
| Germany | Wuergassen (KWW)-640 MW · 18 December 1971 |
| Pakistan | Kanupp-1CANDU-137 MW125 MW · 18 October 1971 |
| Russia | Novovoronezh-3VVER-440/V-179385 MW · 27 December 1971 |
| Spain | Santa Maria De GaronaBWR-3440 MW · 2 March 1971 |
| Sweden | Oskarshamn-1AA-I440 MW · 19 August 1971 |
| Switzerland | MuehlebergBWR-4306 MW · 1 July 1971 |
| Beznau-2WH 2LP350 MW · 23 October 1971 |
| United Kingdom | Wylfa-1MAGNOX550 MW · 24 January 1971 |
| Wylfa-2MAGNOX550 MW · 21 July 1971 |
| United States | MonticelloBWR-3 (Mark 1)545 MW · 5 March 1971 |
| Dresden-3BWR-3 (Mark 1)794 MW · 22 July 1971 |
| PalisadesCE 2LP (DRYAMB)805 MW · 31 December 1971 |
| Closure | Germany | HDR GrosswelzheimSuperheated Steam Reactor25 MW · 20 April 1971 |
| 1970 | Construction Start | Belgium | Tihange-1Framatome 3 Loops870 MW · 1 June 1970 |
| Bulgaria | Kozloduy-1VVER-440/V-230408 MW · 1 April 1970 |
| Kozloduy-2VVER-440/V-230408 MW · 1 April 1970 |
| Canada | Bruce-2CANDU 791696 MW · 1 December 1970 |
| Germany | Biblis-A (KWB A)PWR1146 MW · 1 January 1970 |
| Greifswald-1 (KGR-1)VVER-440/V-230440 MW · 1 March 1970 |
| Greifswald-2 (KGR-2)VVER-440/V-230408 MW · 1 March 1970 |
| Brunsbuettel (KKB)BWR-69770 MW · 15 April 1970 |
| Philippsburg-1 (KKP-1)BWR-69864 MW · 1 October 1970 |
| Italy | CaorsoBWR-4 (Mark 2)840 MW · 1 January 1970 |
| Japan | Takahama-1M (3-Loop)780 MW · 25 April 1970 |
| Shimane-1BWR-3439 MW · 2 July 1970 |
| Fukushima-Daiichi-3BWR-4760 MW · 28 December 1970 |
| Russia | Bilibino-1EGP-611 MW · 1 January 1970 |
| Bilibino-2EGP-611 MW · 1 January 1970 |
| Bilibino-3EGP-611 MW · 1 January 1970 |
| Bilibino-4EGP-611 MW · 1 January 1970 |
| Leningrad-1RBMK-1000925 MW · 1 March 1970 |
| Kola-1VVER-440/V-230411 MW · 1 May 1970 |
| Kola-2VVER-440/V-230411 MW · 1 May 1970 |
| Leningrad-2RBMK-1000925 MW · 1 June 1970 |
| Sweden | Ringhals-2WH 3LP820 MW · 1 October 1970 |
| United Kingdom | Heysham A-1AGR611 MW · 1 December 1970 |
| Heysham A-2AGR611 MW · 1 December 1970 |
| United States | Trojan-1130 MW · 1 February 1970 |
| Limerick-1BWR-4 (Mark 2)1055 MW · 1 April 1970 |
| Limerick-2BWR-4 (Mark 2)1055 MW · 1 April 1970 |
| Sequoyah-1WH 4LP (ICECND)1148 MW · 1 May 1970 |
| Sequoyah-2WH 4LP (ICECND)1148 MW · 1 May 1970 |
| Duane Arnold-1BWR-4 (Mark 1)538 MW · 1 June 1970 |
| Beaver Valley-1WH 3LP (DRYSUB)835 MW · 28 June 1970 |
| St. Lucie-1CE 2LP (DRYAMB)830 MW · 1 July 1970 |
| Davis Besse-1B&W LLP (DRYAMB)906 MW · 1 September 1970 |
| Farley-1WH 3LP (DRYAMB)829 MW · 1 October 1970 |
| Farley-2WH 3LP (DRYAMB)829 MW · 1 October 1970 |
| North Anna-2WH 3LP (DRYSUB)907 MW · 1 November 1970 |
| Diablo Canyon-2WH 4LP (DRYAMB)1106 MW · 9 December 1970 |
| Ukraine | Chornobyl-1RBMK925 MW · 1 March 1970 |
| Construction Suspension or Cancellation | Sweden | MarvikenBHWR193 MW · 1970 |
| Grid Connection | Japan | Mihama-1WH 2LP320 MW · 8 August 1970 |
| Fukushima-Daiichi-1BWR-3439 MW · 17 November 1970 |
| United States | Dresden-2BWR-3 (Mark 1)794 MW · 13 April 1970 |
| Robinson-2WH 3LP (DRYAMB)700 MW · 26 September 1970 |
| Point Beach-1WH 2LP (DRYAMB)497 MW · 6 November 1970 |
| Millstone-1-660 MW · 29 November 1970 |
| 1969 | Construction Start | Armenia | Armenian-1VVER-440/V-270376 MW · 1 July 1969 |
| Belgium | Doel-1WH 2LP392 MW · 1 July 1969 |
| Japan | Fukushima-Daiichi-2BWR-4760 MW · 9 June 1969 |
| Netherlands | BorsseleKWU 2LP495 MW · 1 July 1969 |
| Russia | Beloyarsk-3 (BN-600)BN-600560 MW · 1 January 1969 |
| Sweden | Ringhals-1AA-I760 MW · 1 February 1969 |
| Oskarshamn-2AA-I580 MW · 1 September 1969 |
| United States | Cook-1WH 4LP (ICECND)1030 MW · 25 March 1969 |
| Cook-2WH 4LP (ICECND)1100 MW · 25 March 1969 |
| Rancho Seco-1-918 MW · 1 April 1969 |
| Fermi-2BWR-4 (Mark 1)1093 MW · 1 May 1969 |
| Prairie Island-2WH 2LP (DRYAMB)530 MW · 1 May 1969 |
| Brunswick-1BWR-4 (Mark 1)821 MW · 1 September 1969 |
| Brunswick-2BWR-4 (Mark 1)821 MW · 1 September 1969 |
| Millstone-2CE 2LP (DRYAMB)870 MW · 1 November 1969 |
| Three Mile Island-2-906 MW · 1 November 1969 |
| Grid Connection | France | St. Laurent A-1UNGG480 MW · 14 March 1969 |
| Germany | HDR GrosswelzheimSuperheated Steam Reactor23 MW · 14 October 1969 |
| India | Tarapur-1BWR-1 (Mark 2)200 MW · 1 April 1969 |
| Tarapur-2BWR-1 (Mark 2)200 MW · 5 May 1969 |
| Japan | Tsuruga-1BWR-2341 MW · 16 November 1969 |
| Russia | Novovoronezh-2VVER V-120336 MW · 27 December 1969 |
| Switzerland | Beznau-1WH 2LP350 MW · 17 July 1969 |
| United States | Oyster CreekBWR-2 (Mark 1)650 MW · 23 September 1969 |
| Nine Mile Point-1BWR-2 (Mark 1)620 MW · 9 November 1969 |
| GinnaWH 2LP (DRYAMB)498 MW · 2 December 1969 |
| 1968 | Construction Start | Argentina | Atucha-1PHWR KWU319 MW · 1 June 1968 |
| Canada | Pickering-4CANDU 500A508 MW · 1 May 1968 |
| France | PhénixPH-250233 MW · 1 November 1968 |
| Germany | Wuergassen (KWW)-640 MW · 26 January 1968 |
| India | Rajasthan-2Horizontal Pressure Tube Type207 MW · 1 April 1968 |
| Japan | Mihama-2M (2-Loop)470 MW · 29 May 1968 |
| Spain | Vandellos-1UNGG480 MW · 21 June 1968 |
| Switzerland | Beznau-2WH 2LP350 MW · 1 January 1968 |
| United Kingdom | Hartlepool A-1AGR625 MW · 1 October 1968 |
| Hartlepool A-2AGR600 MW · 1 October 1968 |
| United States | Peach Bottom-2BWR-4 (Mark 1)1065 MW · 1 January 1968 |
| Peach Bottom-3BWR-4 (Mark 1)1065 MW · 1 January 1968 |
| Salem-1WH 4LP (DRYAMB)1090 MW · 1 January 1968 |
| Salem-2WH 4LP (DRYAMB)1115 MW · 1 January 1968 |
| Prairie Island-1WH 2LP (DRYAMB)530 MW · 1 May 1968 |
| Three Mile Island-1B&W LLP (DRYAMB)819 MW · 1 May 1968 |
| Calvert Cliffs-1CE 2LP (DRYAMB)845 MW · 1 June 1968 |
| Calvert Cliffs-2CE 2LP (DRYAMB)845 MW · 1 June 1968 |
| CooperBWR-4 (Mark 1)778 MW · 1 June 1968 |
| Fort Calhoun-1CE 2LP478 MW · 1 June 1968 |
| Surry-1WH 3LP (DRYSUB)788 MW · 1 June 1968 |
| Surry-2WH 3LP (DRYSUB)788 MW · 1 June 1968 |
| Browns Ferry-3BWR-4 (Mark 1)1065 MW · 1 July 1968 |
| Point Beach-2WH 2LP (DRYAMB)497 MW · 1 July 1968 |
| Diablo Canyon-1WH 4LP (DRYAMB)1084 MW · 1 August 1968 |
| KewauneeWH 4LP (DRYAMB)535 MW · 1 August 1968 |
| Pilgrim-1BWR-3 (Mark 1)655 MW · 1 August 1968 |
| FitzpatrickBWR-4 (Mark 1)821 MW · 1 September 1968 |
| Fort St. Vrain-330 MW · 1 September 1968 |
| Hatch-1BWR-4 (Mark 1)777 MW · 1 September 1968 |
| Ano-1 (Arkansas One-1)B&W LLP (DRYAMB)850 MW · 1 October 1968 |
| Maine Yankee-825 MW · 1 October 1968 |
| Indian Point-3WH 4LP (DRYAMB)965 MW · 1 November 1968 |
| Zion-1WH 4LP1040 MW · 1 December 1968 |
| Zion-2WH 4LP1040 MW · 1 December 1968 |
| Grid Connection | Germany | Lingen (KWL)Fossil Fuel-Fired Superheater240 MW · 1 July 1968 |
| Obrigheim (KWO)-283 MW · 29 October 1968 |
| Netherlands | DodewaardGE Design54 MW · 18 October 1968 |
| Spain | Jose Cabrera-1 (Zorita)WH 1LP153 MW · 14 July 1968 |
| United Kingdom | Oldbury A-2MAGNOX300 MW · 6 April 1968 |
| United States | LaCrosse-50 MW · 26 April 1968 |
| Closure | United States | Elk River-22 MW · 1 February 1968 |
| BonusSuperheater17 MW · 1 June 1968 |
| 1967 | Construction Start | Canada | Pickering-3CANDU 500A508 MW · 1 December 1967 |
| Germany | Stade (KKS)-630 MW · 1 December 1967 |
| Japan | Mihama-1WH 2LP320 MW · 1 February 1967 |
| Fukushima-Daiichi-1BWR-3439 MW · 25 July 1967 |
| Russia | Novovoronezh-3VVER-440/V-179385 MW · 1 July 1967 |
| Novovoronezh-4VVER-440/V-179385 MW · 1 July 1967 |
| Switzerland | MuehlebergBWR-4306 MW · 1 March 1967 |
| United Kingdom | Hinkley Point B-1AGR625 MW · 1 September 1967 |
| Hinkley Point B-2AGR625 MW · 1 September 1967 |
| Hunterston B-1AGR624 MW · 1 November 1967 |
| Hunterston B-2AGR624 MW · 1 November 1967 |
| United States | PalisadesCE 2LP (DRYAMB)805 MW · 1 February 1967 |
| Quad Cities-1BWR-3 (Mark 1)789 MW · 1 February 1967 |
| Quad Cities-2BWR-3 (Mark 1)789 MW · 1 February 1967 |
| Robinson-2WH 3LP (DRYAMB)700 MW · 1 April 1967 |
| Turkey Point-3WH 3LP (DRYAMB)693 MW · 1 April 1967 |
| Turkey Point-4WH 3LP (DRYAMB)693 MW · 1 April 1967 |
| Browns Ferry-1BWR-4 (Mark 1)1065 MW · 1 May 1967 |
| Browns Ferry-2BWR-4 (Mark 1)1065 MW · 1 May 1967 |
| Crystal River-3B&W LLP (DRYAMB)825 MW · 1 June 1967 |
| MonticelloBWR-3 (Mark 1)545 MW · 1 June 1967 |
| Point Beach-1WH 2LP (DRYAMB)497 MW · 1 July 1967 |
| Oconee-1B&W LLP (DRYAMB)887 MW · 1 November 1967 |
| Oconee-2B&W LLP (DRYAMB)887 MW · 1 November 1967 |
| Oconee-3B&W LLP (DRYAMB)887 MW · 1 November 1967 |
| Vermont YankeeBWR-4 (Mark 1)514 MW · 1 December 1967 |
| Grid Connection | Canada | Douglas PointCANDU 200203 MW · 7 January 1967 |
| France | Chooz A (Ardennes)CHOOZ-A280 MW · 3 April 1967 |
| EL-4 (Monts d'Arrée)MONTS-D'ARREE70 MW · 9 July 1967 |
| Germany | AVR Juelich (AVR)Pebble Bed Reactor Prototype13 MW · 17 December 1967 |
| Russia | Beloyarsk-2AMB-200146 MW · 29 December 1967 |
| United Kingdom | Oldbury A-1MAGNOX300 MW · 7 November 1967 |
| Winfrith SGHWRSGHWR92 MW · 1 December 1967 |
| United States | Peach Bottom-1-40 MW · 27 January 1967 |
| Saxton253 MW · 1 March 1967 |
| San Onofre-1WH 3LP436 MW · 16 July 1967 |
| Haddam Neck-582 MW · 7 August 1967 |
| Closure | United States | CVTRPrototype17 MW · 10 January 1967 |
| PathfinderPrototype59 MW · 1 October 1967 |
| 1966 | Construction Start | Canada | Pickering-1CANDU 500A508 MW · 1 June 1966 |
| Gentilly-1HW BLWR 250250 MW · 1 September 1966 |
| Pickering-2CANDU 500A508 MW · 1 September 1966 |
| France | St. Laurent A-2UNGG515 MW · 1 January 1966 |
| Germany | Niederaichbach (KKN)Pressure Tube Reactor100 MW · 1 June 1966 |
| Japan | Tsuruga-1BWR-2341 MW · 24 November 1966 |
| Pakistan | Kanupp-1CANDU-137 MW125 MW · 1 August 1966 |
| Spain | Santa Maria De GaronaBWR-3440 MW · 1 September 1966 |
| Sweden | Oskarshamn-1AA-I440 MW · 1 August 1966 |
| United Kingdom | Dounreay PFRPFR234 MW · 1 January 1966 |
| United States | Dresden-2BWR-3 (Mark 1)794 MW · 1 January 1966 |
| GinnaWH 2LP (DRYAMB)498 MW · 1 April 1966 |
| Millstone-1-660 MW · 1 May 1966 |
| Dresden-3BWR-3 (Mark 1)794 MW · 1 October 1966 |
| Indian Point-2WH 4LP (DRYAMB)873 MW · 1 October 1966 |
| Grid Connection | France | Chinon A-3UNGG480 MW · 4 August 1966 |
| Germany | MZFR-50 MW · 9 March 1966 |
| Rheinsberg (KKR)VVER-7062 MW · 6 May 1966 |
| Gundremmingen-A (KRB A)BWR-1237 MW · 1 December 1966 |
| United Kingdom | Sizewell A-1MAGNOX290 MW · 21 January 1966 |
| Sizewell A-2MAGNOX290 MW · 9 April 1966 |
| United States | PathfinderPrototype59 MW · 25 July 1966 |
| Fermi-1Liquid Metal FBR60 MW · 5 August 1966 |
| Closure | United States | PiquaOCM (Organically Cooled and Moderated Reactor)12 MW · 1 January 1966 |
| 1965 | Construction Start | France | Bugey-1UNGG540 MW · 1 December 1965 |
| Germany | HDR GrosswelzheimSuperheated Steam Reactor23 MW · 1 January 1965 |
| Obrigheim (KWO)-283 MW · 15 March 1965 |
| India | Rajasthan-1Horizontal Pressure Tube Type207 MW · 1 August 1965 |
| Netherlands | DodewaardGE Design54 MW · 1 May 1965 |
| Sweden | MarvikenBHWR193 MW · 1 January 1965 |
| Switzerland | Beznau-1WH 2LP350 MW · 1 September 1965 |
| United Kingdom | Dungeness B-1AGR607 MW · 1 October 1965 |
| Dungeness B-2AGR607 MW · 1 October 1965 |
| United States | Nine Mile Point-1BWR-2 (Mark 1)620 MW · 1 April 1965 |
| Grid Connection | France | Chinon A-2UNGG170 MW · 24 February 1965 |
| Japan | Tokai-1MAGNOX159 MW · 10 November 1965 |
| United Kingdom | Trawsfynydd-1MAGNOX250 MW · 14 January 1965 |
| Trawsfynydd-2MAGNOX250 MW · 2 February 1965 |
| Hinkley Point A-1MAGNOX250 MW · 16 February 1965 |
| Hinkley Point A-2MAGNOX250 MW · 19 March 1965 |
| Dungeness A-1MAGNOX275 MW · 21 September 1965 |
| Dungeness A-2MAGNOX275 MW · 1 November 1965 |
| 1964 | Construction Start | Germany | Lingen (KWL)Fossil Fuel-Fired Superheater240 MW · 1 October 1964 |
| India | Tarapur-1BWR-1 (Mark 2)200 MW · 1 October 1964 |
| Tarapur-2BWR-1 (Mark 2)200 MW · 1 October 1964 |
| Kazakhstan | Aktau (BN-350)BN-350135 MW · 1 October 1964 |
| Russia | Novovoronezh-2VVER V-120336 MW · 1 June 1964 |
| Spain | Jose Cabrera-1 (Zorita)WH 1LP153 MW · 24 June 1964 |
| United States | Oyster CreekBWR-2 (Mark 1)650 MW · 1 January 1964 |
| Haddam Neck-582 MW · 1 May 1964 |
| San Onofre-1WH 3LP436 MW · 1 May 1964 |
| Grid Connection | Italy | GariglianoBWR-1150 MW · 1 January 1964 |
| Enrico Fermi (Trino)WH 4LP247 MW · 22 October 1964 |
| Russia | Beloyarsk-1AMB-100102 MW · 26 April 1964 |
| Novovoronezh-1VVER V-120197 MW · 30 September 1964 |
| Sweden | AgestaPrototype9 MW · 1 May 1964 |
| United Kingdom | Hunterston A-1MAGNOX150 MW · 5 February 1964 |
| Hunterston A-2MAGNOX150 MW · 1 June 1964 |
| United States | BonusSuperheater17 MW · 14 August 1964 |
| Closure | United States | HallamLMGMR (SGR - Sodium Cooled-Graphite Moderated Reactor)75 MW · 1 September 1964 |
| 1963 | Construction Start | France | St. Laurent A-1UNGG480 MW · 1 October 1963 |
| United Kingdom | Winfrith SGHWRSGHWR92 MW · 1 May 1963 |
| Wylfa-1MAGNOX550 MW · 1 September 1963 |
| Wylfa-2MAGNOX550 MW · 1 September 1963 |
| United States | LaCrosse-50 MW · 1 March 1963 |
| Grid Connection | France | Chinon A-1UNGG68 MW · 14 June 1963 |
| Italy | LatinaMAGNOX200 MW · 12 May 1963 |
| Japan | JPDRBWR-110 MW · 26 October 1963 |
| United Kingdom | Windscale AGRAGR32 MW · 1 February 1963 |
| United States | Humboldt BayNatural cir.65 MW · 18 April 1963 |
| PiquaOCM (Organically Cooled and Moderated Reactor)11 MW · 1 July 1963 |
| Elk River-22 MW · 24 August 1963 |
| HallamLMGMR (SGR - Sodium Cooled-Graphite Moderated Reactor)75 MW · 1 September 1963 |
| CVTRPrototype17 MW · 18 December 1963 |
| Closure | United States | GE Vallecitos2524 MW · 9 December 1963 |
| 1962 | Construction Start | France | Chooz A (Ardennes)CHOOZ-A280 MW · 1 January 1962 |
| EL-4 (Monts d'Arrée)MONTS-D'ARREE70 MW · 1 July 1962 |
| Germany | Gundremmingen-A (KRB A)BWR-1237 MW · 12 December 1962 |
| Russia | Beloyarsk-2AMB-200146 MW · 1 January 1962 |
| United Kingdom | Oldbury A-1MAGNOX300 MW · 1 May 1962 |
| Oldbury A-2MAGNOX300 MW · 1 May 1962 |
| United States | Peach Bottom-1-40 MW · 1 February 1962 |
| Grid Connection | Belgium | BR-3Prototype11 MW · 10 October 1962 |
| Canada | Rolphton NPDCANDU17 MW · 4 June 1962 |
| United Kingdom | Berkeley-1MAGNOX138 MW · 12 June 1962 |
| Berkeley-2MAGNOX138 MW · 24 June 1962 |
| Bradwell-1MAGNOX150 MW · 1 July 1962 |
| Bradwell-2MAGNOX150 MW · 6 July 1962 |
| Dounreay DFRDFR14 MW · 1 October 1962 |
| United States | Indian Point-1PWR265 MW · 16 September 1962 |
| Big Rock Point-72 MW · 8 December 1962 |
| 1961 | Construction Start | France | Chinon A-3UNGG480 MW · 1 March 1961 |
| Germany | AVR Juelich (AVR)Pebble Bed Reactor Prototype13 MW · 1 August 1961 |
| MZFR-50 MW · 1 December 1961 |
| Italy | Enrico Fermi (Trino)WH 4LP247 MW · 1 July 1961 |
| Japan | Tokai-1MAGNOX159 MW · 1 March 1961 |
| United Kingdom | Sizewell A-1MAGNOX290 MW · 1 April 1961 |
| Sizewell A-2MAGNOX290 MW · 1 April 1961 |
| Grid Connection | Germany | VAK KAHLBWR15 MW · 17 June 1961 |
| 1960 | Construction Start | Canada | Douglas PointCANDU 200203 MW · 1 February 1960 |
| Germany | Rheinsberg (KKR)VVER-7062 MW · 1 January 1960 |
| Japan | JPDRBWR-110 MW · 1 December 1960 |
| United Kingdom | Dungeness A-1MAGNOX275 MW · 1 July 1960 |
| Dungeness A-2MAGNOX275 MW · 1 July 1960 |
| United States | BonusSuperheater17 MW · 1 January 1960 |
| CVTRPrototype17 MW · 1 January 1960 |
| PiquaOCM (Organically Cooled and Moderated Reactor)11 MW · 1 January 1960 |
| Saxton253 MW · 1 January 1960 |
| Big Rock Point-72 MW · 1 May 1960 |
| Humboldt BayNatural cir.65 MW · 1 November 1960 |
| Grid Connection | France | G-3 (Marcoule)UNGG36 MW · 4 April 1960 |
| United Kingdom | Chapelcross-4MAGNOX35 MW · 1 January 1960 |
| United States | Dresden-1-192 MW · 15 April 1960 |
| Yankee NPSPWR175 MW · 10 November 1960 |
| 1959 | Construction Start | France | Chinon A-2UNGG170 MW · 1 August 1959 |
| Italy | GariglianoBWR-1150 MW · 1 November 1959 |
| United Kingdom | Trawsfynydd-1MAGNOX250 MW · 1 July 1959 |
| Trawsfynydd-2MAGNOX250 MW · 1 July 1959 |
| United States | Elk River-22 MW · 1 January 1959 |
| HallamLMGMR (SGR - Sodium Cooled-Graphite Moderated Reactor)75 MW · 1 January 1959 |
| PathfinderPrototype59 MW · 1 January 1959 |
| Grid Connection | France | G-2 (Marcoule)UNGG36 MW · 22 April 1959 |
| United Kingdom | Chapelcross-1MAGNOX35 MW · 1 February 1959 |
| Calder Hall-4MAGNOX35 MW · 1 April 1959 |
| Chapelcross-2MAGNOX35 MW · 1 July 1959 |
| Chapelcross-3MAGNOX35 MW · 1 November 1959 |
| 1958 | Construction Start | Canada | Rolphton NPDCANDU17 MW · 1 January 1958 |
| Germany | VAK KAHLBWR15 MW · 1 July 1958 |
| Italy | LatinaMAGNOX200 MW · 1 November 1958 |
| Russia | Beloyarsk-1AMB-100102 MW · 1 June 1958 |
| Slovakia | Bohunice A1KS 15093 MW · 1 August 1958 |
| United Kingdom | Windscale AGRAGR32 MW · 1 November 1958 |
| Grid Connection | United Kingdom | Calder Hall-3MAGNOX35 MW · 1 March 1958 |
| 1957 | Construction Start | Belgium | BR-3Prototype11 MW · 1 November 1957 |
| France | Chinon A-1UNGG68 MW · 1 February 1957 |
| Russia | Novovoronezh-1VVER V-120197 MW · 1 July 1957 |
| Sweden | AgestaPrototype9 MW · 1 December 1957 |
| United Kingdom | Berkeley-1MAGNOX138 MW · 1 January 1957 |
| Berkeley-2MAGNOX138 MW · 1 January 1957 |
| Bradwell-1MAGNOX150 MW · 1 January 1957 |
| Bradwell-2MAGNOX150 MW · 1 January 1957 |
| Hunterston A-1MAGNOX150 MW · 1 October 1957 |
| Hunterston A-2MAGNOX150 MW · 1 October 1957 |
| Hinkley Point A-1MAGNOX250 MW · 1 November 1957 |
| Hinkley Point A-2MAGNOX250 MW · 1 November 1957 |
| United States | Yankee NPSPWR175 MW · 1 November 1957 |
| Grid Connection | United Kingdom | Calder Hall-2MAGNOX35 MW · 1 February 1957 |
| United States | GE Vallecitos2524 MW · 19 October 1957 |
| ShippingportPLWBR60 MW · 2 December 1957 |
| 1956 | Construction Start | France | G-3 (Marcoule)UNGG36 MW · 1 March 1956 |
| United States | GE Vallecitos2524 MW · 1 January 1956 |
| Dresden-1-192 MW · 1 May 1956 |
| Indian Point-1PWR265 MW · 1 May 1956 |
| Fermi-1Liquid Metal FBR60 MW · 1 August 1956 |
| Grid Connection | United Kingdom | Calder Hall-1MAGNOX35 MW · 27 August 1956 |
| 1955 | Construction Start | France | G-2 (Marcoule)UNGG36 MW · 1 March 1955 |
| United Kingdom | Dounreay DFRDFR14 MW · 1 March 1955 |
| Calder Hall-3MAGNOX35 MW · 1 August 1955 |
| Calder Hall-4MAGNOX35 MW · 1 August 1955 |
| Chapelcross-1MAGNOX35 MW · 1 October 1955 |
| Chapelcross-2MAGNOX35 MW · 1 October 1955 |
| Chapelcross-3MAGNOX35 MW · 1 October 1955 |
| Chapelcross-4MAGNOX35 MW · 1 October 1955 |
| 1954 | Construction Start | United States | ShippingportPLWBR60 MW · 1 January 1954 |
| Grid Connection | Russia | APS-1 ObninskAM-15 MW · 27 June 1954 |
| 1953 | Construction Start | United Kingdom | Calder Hall-1MAGNOX35 MW · 1 August 1953 |
| Calder Hall-2MAGNOX35 MW · 1 August 1953 |
| 1951 | Construction Start | Russia | APS-1 ObninskAM-15 MW · 1 January 1951 |